CONTRACTOR's fee shall be computed on the or acts or neglect by utility owners or other contractors <br /> basis of the net change in accordance with para- performing other work as contemplated by Article 7. <br /> graphs 12.01 .C .2.a through 12 .01 .C.2 .e, inclusive. <br /> B. Nothing in this paragraph 12.06 bars a change in <br /> 12.02 Change of Contract Times Contract Price pursuant to this Article 12 to compensate <br /> CONTRACTOR due to delay, interference , or disruption directly <br /> A. The Contract Times (or Milestones) may only be attributable to actions or inactions of OWNER or anyone for <br /> changed by a Change Order or by a Written Amendment. Any whom OWNER is responsible. <br /> Claim for an adjustment in the Contract Times (or Milestones) <br /> shall be based on written notice submitted by the party making <br /> the claim to the ENGINEER and the other party to the Contract ARTICLE 13 - TESTS AND INSPECTIONS; CORRECTION , <br /> in accordance with the provisions of paragraph 10.05. REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK <br /> B. Any adjustment of the Contract Times (or Milestones) <br /> covered by a Change Order or of any Claim for an adjustment in 13.01 Notice of Defects <br /> the Contract Times (or Milestones) will be determined in <br /> accordance with the provisions of this Article 12. A. Prompt notice of all defective Work of which OWNER <br /> or ENGINEER has actual knowledge will be given to <br /> 12 .03 Delays Beyond CONTRACTOR's Control CONTRACTOR. All defective Work may be rejected, corrected , <br /> or accepted as provided in this Article 13. <br /> A. Where CONTRACTOR is prevented from completing <br /> any part of the Work within the Contract Times (or Milestones) 13.02 Access to Work <br /> due to delay beyond the control of CONTRACTOR , the <br /> Contract Times (or Milestones) will be extended in an amount A. OWNER, ENGINEER, ENGINEER's Consultants, <br /> equal to the time lost due to such delay if a Claim is made other representatives and personnel of OWNER, independent <br /> therefore as provided in paragraph 12.02.A. Delays beyond the testing laboratories, and governmental agencies with <br /> control of CONTRACTOR shall include, but not be limited to, jurisdictional interests will have access to the Site and the Work <br /> acts or neglect by OWNER, acts or neglect of utility owners or at reasonable times for their observation, inspecting, and <br /> other contractors performing other work as contemplated by testing. CONTRACTOR shall provide them proper and safe <br /> Article 7, fires, floods, epidemics, abnormal weather conditions, conditions for such access and advise them of <br /> or acts of God. CONTRACTOR's Site safety procedures and programs so that <br /> they may comply therewith as applicable. <br /> 12. 04 Delays Within CONTRACTOR's Control <br /> 13 .03 Tests and Inspections <br /> A. The Contract Times (or Milestones) will not be <br /> extended due to delays within the control of CONTRACTOR. A. CONTRACTOR shall give ENGINEER timely notice <br /> Delays attributable to and within the control of a Subcontractor of readiness of the Work for all required inspections, tests, or <br /> or Supplier shall be deemed to be delays within the control of approvals and shall cooperate with inspection and . testing <br /> CONTRACTOR . personnel to facilitate required inspections or tests. <br /> 12.05 Delays Beyond OWNER's and CONTRACTOR's B. OWNER shall employ and pay for the services of an <br /> Control independent testing laboratory to perform all inspections, tests, <br /> or approvals required by the Contract Documents except: <br /> A. Where CONTRACTOR is prevented from completing <br /> any part of the Work within the Contract Times (or Milestones) 1 .for inspections, tests, or approvals covered by <br /> due to delay beyond the control of both OWNER and paragraphs 13.03.0 and 13.03.D below; <br /> CONTRACTOR, an extension of the Contract Times (or <br /> Milestones) in an amount equal to the time lost due to such 2.that costs incurred in connection with tests or <br /> delay shall be CONTRACTOR's sole and exclusive remedy for inspections conducted pursuant to paragraph 13.04.8 <br /> such delay. shall be paid as provided in said paragraph 13.04.6 ; <br /> and <br /> 12.06 Delay Damages <br /> 3.as otherwise specifically provided in the Contract <br /> A. In no event shall OWNER or ENGINEER be liable to Documents. <br /> CONTRACTOR, any Subcontractor, any Supplier, or any other <br /> person or organization , or to any surety for or employee or C. If Laws or Regulations of any public body having <br /> agent of any of them, for damages arising out of or resulting jurisdiction require any Work (or part thereof) specifically to be <br /> from: inspected, tested, or approved by an employee or other <br /> representative of such public body, CONTRACTOR shall <br /> 1 .delays caused by or within the control of CON- assume full responsibility for arranging and obtaining such <br /> TRACTOR; or inspections, tests, or approvals, pay all costs in connection <br /> therewith, and furnish ENGINEER the required certificates of <br /> 2.delays beyond the control of both OWNER and inspection or approval. <br /> CONTRACTOR including but not limited to fires, floods, <br /> epidemics, abnormal weather conditions, acts of God, D . CONTRACTOR shall be responsible for arranging <br /> and obtaining and shall pay all costs in connection with any <br /> 00700 General Conditions (EJCDC).doc <br /> 00700 - 28 <br /> 1307-029 12 Inch WM - V= L ke Esuas\Dccumen1s'JteponskBidding Conamt Specificiaton WWW Geneml Conditions (EJCDC).doc <br />