Laserfiche WebLink
3 . Specifications <br /> 4 . Supplementary Conditions <br /> 5 . General Conditions <br /> 6 . Approved Shop Drawings <br /> 7 . Drawings <br /> 8 . Referenced Standards . <br /> 3 . Written/computed dimensions shall govern over scaled dimensions . <br /> SC-4. 05 Reference Points <br /> SC-4 . 05 Add the following new paragraphs immediately after GC-4 . 05. A : <br /> B . Contractor is responsible for measuring and recording existing Swale elevations <br /> at 100' intervals prior to construction . Existing Swale elevations shall be <br /> maintained throughout construction . Contractor is also responsible for <br /> preservation and/or replacement of any and all existing permanent survey <br /> monumentation affected by construction . <br /> C . ENGINEER may check the lines , elevations , reference marks , batter boards , <br /> etc. , set by CONTRACTORS , and CONTRACTOR shall correct any errors <br /> disclosed by such a check . Such a check shall not be considered as approval of <br /> CONTRACTOR'S work and shall no relieve CONTRACTOR of the responsibility <br /> for accurate construction of the entire work. CONTRACTOR shall furnish <br /> personnel to assist ENGINEER in checking lines and grades . <br /> SC -4.06 Hazardous Environmental Condition at Site <br /> SC-4 . 06 G . Delete paragraph GC-4. 06 G. <br /> SC -5. 01 Performance , Payment and Other Bonds <br /> SC-5 . 01 .A. Delete paragraph GC-5. 01 .A in its entirety and insert the following paragraphs <br /> in its place: <br /> A . Within ten ( 10) days of receipt of the Contract Documents for execution , the <br /> CONTRACTOR shall furnish a Performance Bond in an amount equal to 100% of <br /> the Contract Price and a Payment Bond in an amount equal to 100 % of the Contract <br /> Price . <br /> 1 . The CONTRACTOR shall provide two separate bonds . A combined <br /> Payment and Performance Bond for 100% of the Contract Price is <br /> not an acceptable substitute . <br /> 2 Such Bonds shall continue in effect for one ( 1 ) year after acceptance <br /> of the Work and final payment by the OWNER . <br /> 00800 Supplementary Conditions.doc <br /> 00800 - 2 <br /> J W7] 2912 Inch WM - Vero Lake EstateslDocuments%Reports%Bidrhng Contract SpecificationsM800 Supplementary Conditions.doc <br />