My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-403
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 1:06:00 PM
Creation date
9/30/2015 11:28:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/20/2007
Control Number
2007-403
Agenda Item Number
11.J.2
Entity Name
Sheltra and Sons Construction
Subject
Master Planned Water Transmission Main
Area
Vero Lakes Estates
Project Number
UCP 2958
Bid Number
2008015
Supplemental fields
SmeadsoftID
6699
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01060 <br /> REGULATORY REQUIREMENTS AND NOTIFICATION <br /> PART1 -- GENERAL <br /> 1 .01 PERMITS REQUIRED <br /> A. Florida Department of Environmental Protection : The general permit from <br /> the Florida Department of Environmental Protection ( FDEP) for the project <br /> has been obtained by IRCDUS . <br /> B . INDIAN RIVER COUNTY : The Contractor, along with the Utilities <br /> Department, must obtain right-of-way permit(s) from the Indian River County <br /> Public Works Department prior to initiating construction . It typically requires <br /> three weeks processing time to receive a right-of-way permit. There is no <br /> processing fee for the permit. One set of construction plans must be <br /> submitted along with a permit application to the Indian River County <br /> Engineering Division . Some of the conditions of the County right-of-way <br /> permits are as follows: <br /> 1 . Applicant shall not begin construction of any kind in the County right- <br /> of-way prior to application and issuance of a valid permit by the <br /> Indian River County Engineering Division . <br /> 2. Any area disturbed in the County right-of-way must be restored by <br /> applicant to a condition equal to or better than existing just prior to <br /> construction , including but not limited to compaction , grading , paving , <br /> seeding and mulching , sodding, etc. , as the case may be. The <br /> quality of construction , materials, and workmanship shall be in <br /> accordance with County standards . All disturbed areas shall be <br /> restored within 48 hours after excavation . <br /> 3 . Applicant shall notify the Indian River County Engineering Division at <br /> least 48 hours prior to the placement of concrete, paving of asphalt, <br /> installation of culverts, or backfilling of trenches , so that the Indian <br /> River County Engineering Division may inspect installations as <br /> necessary. Applicant shall further notify the Indian River County <br /> Engineering Division in writing of its request for final inspection and <br /> approval at the completion of the permitted activity. <br /> 4. The applicant shall assume responsibility for all maintenance, <br /> replacement, or removal of any right-of-way improvement authorized <br /> by this permit; and applicant further agrees by acceptance of this <br /> permit to indemnify and save harmless the County, its officers, <br /> employees, or agents, from any damages, claims , causes of action, <br /> or losses, whether for personal injury, loss of life or property <br /> damage , arising from the actions or omissions of applicant, its <br /> officers, agents, or employees , associated with the placement, <br /> maintenance or removal of installations authorized by this permit. <br /> 01060 Regulatory Requirements and Notification.doc <br /> 1060 - 1 <br /> J W-02912 Inch WM - Vem Lake EstatesMercumenls\Reports\Bidding Contract Specifications\01060 Regulatory Requirements and Notification.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.