My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/1/1958
CBCC
>
Meetings
>
1950's
>
1958
>
4/1/1958
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 9:40:55 AM
Creation date
6/9/2015 3:12:50 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/01/1958
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l <br />exercised to overcome any tendency for the base in the vicinity of a junction between runs to <br />I <br />fail to be full thickness and true to grade or to be inadequately compacted, improperly pro- <br />portioned, inadequately wetted, or incompletely mixed. When any of these operations, after <br />I <br />the application of cement, are interrupted for more than two hours for any reason, or when the <br />uncompacted soil cement mixture is wetted by rain so that the required moisture content is <br />lost, the entire section shall be reconstructed, except that the quantity of cement to be <br />B <br />added to the previously processed soil cement mixture shall be 50% of the amount originally <br />i� <br />specified. <br />No cement shall be applied unless the temperature is at least 40 degrees F. and ris- <br />ing. <br />Immediately after compacting and finishing, the completed base shall be covered and <br />protected against rapid drying either by an approved method of earth curing or by a bituminous <br />seal coat. Thickness determination shall be made as directed by the County Engineer. <br />(d.3) Mixed in place base. <br />This base course shall be composed of a compacted mixture of 60% mineral <br />aggregate and 40% marl (excluding plastic material) or shell material together with asphaltic <br />material. The constituents of the mixed in place base shall be combined in such proportions` <br />that after complete mixing, the resultant mixture shall be homogeneous and all particles <br />i <br />coated with bituminous material. The exact quantity of bituminous material shall be determined';, <br />by the engineer during the operations of applying and mixing and will depend upon the character!,# <br />and grading of the aggregate material. The proportions shall be varied, as directed by the <br />engineer, after laboratory tests and field trials are conducted. The quantity of bituminous <br />material shall be approximately 0.3 to 1.3 gallons per square yard per inch of compacted <br />thickness. Unless otherwise specified and approved, the bituminous material shall be cut back <br />asphalt grade RC -1S. <br />All equipment necessary for the proper construction of this work shall be on <br />the project, in first class working condition, and shall have been approved by the engineer <br />before construction is started. Unless.otherwise approved a Seaman Mixer or a P&H Mixer <br />shall be used to mix the material in place and a sheep's foot roller., or other approved types <br />& methods, shall be used for compaction. If in place material is to become a portion of the <br />base course the amount to be used must be wind rowed and the sub -grade prepared as described <br />in Section X -3(c). All base course material shall have all roots and foreign matter removed <br />to the satisfaction of the engineer. After the placing of the base material it shall be <br />machined with the grader until a uniformity of line and grade has been obtained as determined <br />by the engineer. No bituminous material shall be applied when the moisture content of the <br />aggregate material is greater than 5% by weight, unless otherwise specified by the engineer. <br />No application of bituminous material, mixing, spreading or finishing shall be done when the <br />air temperature is less than 50 degrees F., or when in the opinion of the engineer the weather <br />condition or the condition of the aggregate material is unsuitable. <br />After mixing has been completed the mixture shall be cured until it has reached the <br />proper consistency to be compacted. The mixture shall first be rolled with the sheep's foot <br />1 <br />1 <br />0 <br />1 <br />0 <br />1 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.