Laserfiche WebLink
and provisions of this Agreement . Calpine shall be responsible for operation, subject to the <br /> District ' s Water Level Guidelines , and maintenance of the pumping station at the stormwater park <br /> design withdrawal point and pipeline from the stormwater park design withdrawal point to the <br /> BHEC , as defined in Paragraph 3 .b . C , and the County shall have no responsibility for such pumping <br /> station at the stormwater park design withdrawal point and pipeline from the stormwater park design <br /> withdrawal point to the BHEC . <br /> 5 , Stormwater Quality : <br /> a. The County agrees to design, permit, construct, operate and maintain <br /> the stormwater park in accordance with Exhibit ` B" hereto , and to make the necessary improvements <br /> or modifications to its stormwater collection, storage, or delivery systems, as needed, in order to <br /> comply with the terms and provisions of this Agreement during the Term of this Agreement. <br /> b . The County shall test the constituents listed in Exhibit "B" only if they <br /> are required as part of the County' s FDEP or SJRWNID stormwater management permit or permits . <br /> The County shall supply Calpine a copy of its FDEP and SJRWMD permits and all renewals <br /> promptly upon their issuance . At the same time the County shall provide Calpine with a listing of all <br /> constituents to be tested and the testing frequency. Calpine may test all or selected parameters to <br /> determine the water quality delivered by the County. <br /> 12 <br /> 8 . 5 .04 Water Agreement <br />