My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-185
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2016 11:26:44 AM
Creation date
9/30/2015 7:53:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
08/10/2004
Control Number
2004-185
Agenda Item Number
12
Entity Name
Blue Heron Energy Center
Subject
Delivery and Use of Stormwater
Area
Blue Heron Energy Center
Archived Roll/Disk#
3223
Supplemental fields
SmeadsoftID
4205
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Level Guidelines" for withdrawal of water from the District ' s canal system for use by others, <br /> including Calpine) . The County will operate the stormwater park so as to maximize the water <br /> inventory available to BHEC . Notwithstanding anything herein provided to the contrary, BHEC will <br /> not be permitted to withdraw, at any time, water from the upper pool of the District ' s system. The <br /> County shall also be responsible to make the necessary improvements and/or modifications to its <br /> stormwater collection, storage and delivery systems, as needed, (except the works or structures of the <br /> District) in order to comply with the terms and provisions of this Agreement . The design, <br /> permitting, construction, operation and maintenance of the stormwater park and improvements <br /> and/or modifications to the stormwater collection, storage, and delivery systems, shall be done in <br /> accordance with the requirements of Exhibit ` B ", Stormwater Park and Water Supply System <br /> Operational requirements , and the District ' s Water Level Guidelines . <br /> 3 , Connection Corridor and Construction Costs : <br /> a. After purchase of the property for the stormwater park, Calpine shall <br /> be responsible for all costs of designing, permitting, constructing and connecting the stormwater <br /> pipelines and pumping stations from : (i) the District' s Lateral "C" canal to the design discharge point <br /> into the stormwater park; (ii) for the stormwater park bypass ; and (iii) from the design withdrawal <br /> point at the stormwater park to BHEC (collectively the "Pipelines") . Calpine, the County and the <br /> District, will jointly determine the actual withdrawal point location from the lower pool, immediately <br /> downstream of the Lateral "C" canal radial gate, dependent upon the quantity of stormwater <br /> available at the withdrawal location. The Pipelines shall be constructed according to routing agreed <br /> 5 <br /> 8 . 5 .04 Water Agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.