Laserfiche WebLink
ATTACHMENT "A" <br /> Scope of Work for <br /> Drawing Revision and Creation on the <br /> Pelican Island NWR Upland Restoration Plan <br /> In 2001 , Brad Smith Associates , Inc . completed a drawing project entitled <br /> "Pelican Island National Wildlife Refuge Upland Restoration Plan", BSA Project <br /> Number 00- 1005 . This scope of work encompasses modifying drawings from that <br /> project, creating new ones as needed, and supplying reproducibles and copies of the <br /> drawings per the following items . Mark Graham with the U . S . Fish and Wildlife Service <br /> (USFWS) at Pelican Island National Wildlife Refuge (PINWR) will provide details of <br /> necessary changes by providing ArcView 3 . 2a shapefiles , Excel files , Word files , <br /> redlined drawings , or verbal descriptions as appropriate . (Note : "will" denotes actions <br /> by the USFWS and "shall" denotes actions by the design contractor. ) <br /> 1 . The following drawings from BSA Project No . 00- 1005 are anticipated to have <br /> changes and/or need to be provided for construction and permit modifications : <br /> CS - 1 , PD - 1 , PD-2 , PD -3 , PD-4, SP - 1 , C - 1 , C -3 , C-4 , C - 6 , C- 7 , and C - 8 . If the <br /> following features cannot be accommodated on the existing drawings , new <br /> drawings will be needed for: planting areas , citrus tree "hammocks" to be left <br /> from an existing block of trees , and excavated dirt staging areas . <br /> Only a portion of the project is being constructed at this time . Copies shall be <br /> provided as follows for the drawings listed in the preceding paragraph. The <br /> design contractor shall provide review prints as needed during the drawing <br /> revision and creation phase of the work . One original set of reproducible plans <br /> and one signed/sealed copy of the plans shall be provided to Indian River County. <br /> Two copies of the plans shall be provided to the USFWS . One copy of computer <br /> files used to generate the drawings shall be provided on CD( s) to the USFWS . <br /> 2 . Revise the slopes for Aquatic Habitats 1 , 2 , 3 and Ephemeral Ponds 1 , 2 , 35 4 , 55 6 <br /> to be 8 : 1 . Reconcile the drawings regarding slope cross sections to show proper <br /> depths and slopes . A perimeter berm shall be shown on the Aquatic Habitats but <br /> not the Ephemeral Ponds . <br /> 3 . Reshape and relocate Aquatic Habitats 1 , 2 , 3 and Ephemeral Ponds 1 , 2 , 3 , 4 , 5 , 6 <br /> per the ArcView files that will be provided by the USFWS . The provided files <br /> will show the outline for the toe of the containment berm on the Aquatic Habitats <br /> and the outer outline for the Ephemeral Ponds . The drawings of the Aquatic <br /> Habitats by the design contractor shall show the toe of the containment berm and <br /> the toe of the 8 : 1 slope . The contours for water surface control elevation and <br /> slope transition shall be removed . The drawings of the Ephemeral Ponds shall <br /> 12/ 18 /2003 Page lof 3 <br /> Rev . 2 <br />