Laserfiche WebLink
16 . Revise project contacts and drawing index on drawing CS - 1 per USFWS <br /> direction. <br /> 17 . Revise notes denoting acreages of east-west drainage ditches to be filled based on <br /> new Aquatic Habitats shapes/locations and section of ditch not to be filled per <br /> USFWS direction . <br /> 18 . Remove a turbidity barrier not needed because of a nonexistent culvert per <br /> USFWS direction . <br /> 19 . Denote construction work that has already been accomplished : Aquatic Habitat 3 , <br /> Ephemeral Ponds 4 , 5 , 6 , and backfilling of southernmost east-west ditch and <br /> western Jungle Trail ditch. <br /> 12/ 18/2003 Design Scope of Work for PINWR Upland Restoration Page 3 of 3 <br /> Rev . 2 <br />