My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-295
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-295
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 1:04:48 PM
Creation date
10/1/2015 12:37:17 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/16/2008
Control Number
2008-295
Agenda Item Number
8.Q.
Entity Name
Bridge Design Associates
Subject
Work Order No. 11 Services Agreement
Project Number
0745
Supplemental fields
SmeadsoftID
7578
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 5 Line 1 10 : 48 : 15 a . m . 03- 28 - 2008. 31J <br /> :J • 4 BRIDGE DESIGN ASSOCIATES, INC. <br /> � <br /> INDIAN RIVE� LEVARD PEDESTRIAN BRIDGE OVER 14TH STREET CANAL <br /> mill : <br /> April 9, 2008 <br /> HOURLY BREAKDOWN OF SERVICES <br /> EXHIBIT "An <br /> CHIEF SENIOR ENGINEER ENGINEER CAD TOTAL i LABOR <br /> ENGINEER ENGINEER INTERN TECHNICIAN TECHNICIAN HOURS COST <br /> ACTIVITY <br /> BY BY <br /> ACTIVITY ACTIVITY <br /> $130.50 $110.20 $82,35 $62.35 $89.90 <br /> DESIGN <br /> I <br /> Bridge Design Criteria 2.0 6.0 <br /> 8.0 L$922.20 <br /> Pile Foundation Design & Details 2.0 8.0 2.0 12.0 $1 ,267.30 <br /> Meetings with Indian River County2.0 4.0 8.0 14.0 $1 .421 .00 <br /> PLAN PREPARATION <br /> Cover Sheet 1 .0 4.0 5.0 $469,80 <br /> Standards Sheet 2.0 4.0 6,0 $580.00 <br /> PieR View 20 8.0 10.0 $880.20 <br /> Cross Section 2.0 4.0 4.0 10.0 $1 ,081 .40 <br /> Miscellaneous Details 4.0 <br /> 16.0 20.0 319e79.20 <br /> Subtotal Design <br /> $8,58}, 10 <br /> CONSTRUCTION <br /> Review Shop Dra%Wnos 8.0 8.0 3881 .60 <br /> . Pile D6ving Inspections 1s.a 15.0 $99ZSD <br /> -Reinforcing Casting trivection 8.0 8 ,0 $498.80 <br /> Seml-Final Inspection B.a 6.0 12.0 $1 ,157.10 <br /> Final Inspection 6.D B.0 12.D $1 ,157.10 <br /> Subtotal Constn.rction 54 est 20 <br /> TOTAL MANHOURS 220 37.0 2.0 36.0 44.0 141 .0 <br /> DIRECT LABOR COST $2,871 .00 $49077.40 $124.70 $2,244.60 $3,965.60 $13,273.30 <br /> 14th pedestrian tilidpe <br /> ENGINEERING FEES $13,273.30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.