Laserfiche WebLink
i <br /> 5 Line 1 10 : 48 : 15 a . m . 03- 28 - 2008. 31J <br /> :J • 4 BRIDGE DESIGN ASSOCIATES, INC. <br /> � <br /> INDIAN RIVE� LEVARD PEDESTRIAN BRIDGE OVER 14TH STREET CANAL <br /> mill : <br /> April 9, 2008 <br /> HOURLY BREAKDOWN OF SERVICES <br /> EXHIBIT "An <br /> CHIEF SENIOR ENGINEER ENGINEER CAD TOTAL i LABOR <br /> ENGINEER ENGINEER INTERN TECHNICIAN TECHNICIAN HOURS COST <br /> ACTIVITY <br /> BY BY <br /> ACTIVITY ACTIVITY <br /> $130.50 $110.20 $82,35 $62.35 $89.90 <br /> DESIGN <br /> I <br /> Bridge Design Criteria 2.0 6.0 <br /> 8.0 L$922.20 <br /> Pile Foundation Design & Details 2.0 8.0 2.0 12.0 $1 ,267.30 <br /> Meetings with Indian River County2.0 4.0 8.0 14.0 $1 .421 .00 <br /> PLAN PREPARATION <br /> Cover Sheet 1 .0 4.0 5.0 $469,80 <br /> Standards Sheet 2.0 4.0 6,0 $580.00 <br /> PieR View 20 8.0 10.0 $880.20 <br /> Cross Section 2.0 4.0 4.0 10.0 $1 ,081 .40 <br /> Miscellaneous Details 4.0 <br /> 16.0 20.0 319e79.20 <br /> Subtotal Design <br /> $8,58}, 10 <br /> CONSTRUCTION <br /> Review Shop Dra%Wnos 8.0 8.0 3881 .60 <br /> . Pile D6ving Inspections 1s.a 15.0 $99ZSD <br /> -Reinforcing Casting trivection 8.0 8 ,0 $498.80 <br /> Seml-Final Inspection B.a 6.0 12.0 $1 ,157.10 <br /> Final Inspection 6.D B.0 12.D $1 ,157.10 <br /> Subtotal Constn.rction 54 est 20 <br /> TOTAL MANHOURS 220 37.0 2.0 36.0 44.0 141 .0 <br /> DIRECT LABOR COST $2,871 .00 $49077.40 $124.70 $2,244.60 $3,965.60 $13,273.30 <br /> 14th pedestrian tilidpe <br /> ENGINEERING FEES $13,273.30 <br />