My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-253
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-253
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2016 11:26:15 AM
Creation date
10/1/2015 3:53:25 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
09/22/2009
Control Number
2009-253
Agenda Item Number
8.N.
Entity Name
Bridge Design Associates
Subject
Amendment No.2 to Work Order No.9
Old Dixie Highway over South Relief Canal
Area
Old Dixie Highway between 2nd. St. SW and 3rd. Pl.
Project Number
03-538
Supplemental fields
SmeadsoftID
10818
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Q10a011aq Sd <br /> INDIAN RIVER COUNTY A40 ! ;t S3 <br /> OLD DIXIE HIGHWAY BRIDGE OVER SOUTH RELIEF CANAL <br /> AMENDMENT NO . 2 TO WORK ORDER It 9 TO THE PROFESSIONAL BRIDGE <br /> DESIGN SERVICES AGREEMENT FOR ANNUAL BRIDGE SERVICES BETWEEN <br /> BRIDGE DESIGN ASSOCIATES , INC . AND INDIAN RIVER COUNTY , FLORIDA . <br /> This is an amendment to WORK ORDER #9 dated July 8 , 2008 to the agreement <br /> (AGREEMENT ) dated October 3 , 2006 for Professional Bridge Design Services Annual <br /> Contract between Bridge Design Associates , Inc . (ENGINEER ) and Indian River County <br /> ( COUNTY ) . <br /> AMENDMENT DESCRIPTION <br /> This Amendment includes the following : <br /> The ENGINEER will perform the necessary engineering services to the Old Dixie Highway <br /> Bridge over South Relief Canal Project by revising the plans to include a separate set of plans for <br /> a 6" diameter directional bore under the South Relief canal , attachment of an 8 " diameter water <br /> main to the new bridge and water main / force main deflections to avoid conflicts with drainage <br /> structures . <br /> " SECTION I — PROJECT LIMITS AND DESCRIPTION" <br /> The project is located approximately 3300 feet north Along Old Dixie Highway between 2 °d <br /> Street SW and P Place . <br /> The work will include the replacement of the Old Dixie Highway Bridge over the South Relief <br /> Canal , approximately 3300 feet of road and drainage improvements to the approaches of the <br /> bridge , stormwater treatment ponds , utility improvements and other work necessary to complete <br /> the project . <br /> " SECTION III — SCOPE OF SERVICES " is being modified to include the following : <br /> The preparation of plans and specifications for the water main and sanitary sewer force main <br /> improvements associated with the Old Dixie Highway Bridge replacement over South Relief <br /> Canal and associated road and drainage improvements . The plans will include a 6" diameter <br /> directional bore under the South Relief canal , attachment of an 8 " diameter water main to the <br /> new bridge and water main / force main deflections to avoid conflicts with drainage structures . <br /> " SECTION IV — TIME FOR COMPLETION " <br /> The final plans shall be completed and all appropriate permits obtained within six weeks after <br /> notice to proceed . <br /> " SECTION V — COMPENSATION " is being modified to incorporate the following : <br /> The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered <br /> pursuant to this Agreement fees inclusive of expenses in accordance with the following : <br /> Bridge Design Associates , Inc . Lump Sum $ 84315 . 00 <br /> TOTAL Amendment No . 2 $ 8315 . 00 <br /> S 'V'_001 JubaA03 S { N Old Disk orct 5onah RelictA( lin'r ,p ,ndrnreAAmcndmcnlN2¢ WCN19VAmendmentk_lo R'O#9.duc <br />
The URL can be used to link to this page
Your browser does not support the video tag.