Laserfiche WebLink
1 � <br /> BRIDGE DESIGN ASSOCIATES , INC . <br /> 57TH STREET BRIDGE OVER LATERAL OX CANAL <br /> CONSTRUCTION PHASE SERVICES <br /> December 15, 2006 <br /> HOURLY BREAKDOWN OF SERVICES <br /> EXHUT Ir <br /> PROJECT PROJECT FIELD REP CAD TOTAL LABOR <br /> MANAGER ENGINEER EJ. TECHNICIAN HOURS COST <br /> ACTiV1TY BY BY <br /> $145.00 $115.00 $60.00 $80.00 ACTIVITY ACTIVITY <br /> Pre Construction Meeti 5.0 5.0 10.0 $1 ,025.00 <br /> Shop Drawing Reviews / concrete mix, best pile <br /> pre-cast com 2.0 16.0 16.0 34.0 $3,090. 00 <br /> Pile Casting / Sheet Piles 80.0 80. 0 $4.800.00 <br /> Pile Driving 64.0 64.0 $3,840M <br /> Pile Caps 16.0 16.0 $960.00 <br /> Prestressed Placement ! Closure Pour 12.0 12.0 $720.00 <br /> Post Tensioning 2.0 2.0 12.0 16.0 $1 ,240.00 <br /> Sidewalks 8.0 8. 0 $480.00 <br /> Barriers 16.0 16.0 $960.00 <br /> N?proach Slab 16.0 16.0 $960,00 <br /> Approach Slabs sidewalks 16.0 16.0 $960.00 <br /> roach Slab barriers 24.0 24.0 $1 ,440.00 <br /> Revetment & misc. pipes 16.0 16.0 $960. 00 <br /> Final Inspection 2.0 2.0 4. 0 $410. 00 <br /> Final Report & Certification 2.0 2.0 $290.00 <br /> 0.0 $0. 00 <br /> 0.0 $0. 00 <br /> TOTAL MANHOURS 13.0 18.0 303. 0 0. 0 334.0 <br /> DIRECT LABOR COST $1 ,885.00 $2,070.00 $18, 180.00 $0.00 $22, 135.00 <br /> ENGINEERING FEEES $22, 135. 00 <br /> GRL TEST PILE $5,000. 00 <br /> TOTAL FEES $27, 13,5. 00 <br /> SA2008-Jobs1PROPOSALS - RFPSl57th Street & 66th Avenuelproposal Exhibit 8 <br />