My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-313
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-313
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 1:06:53 PM
Creation date
10/1/2015 12:41:10 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Third Amendment
Approved Date
09/23/2008
Control Number
2008-313
Agenda Item Number
8.CC.
Entity Name
Bridge Design Assoc.
Subject
Amendment No. 3 5th St.SW Bridge, Old Dixie Highway Bridge
Area
5th St. SW over Lateral C Canal 43rd Ave. over South Relief Can
Supplemental fields
SmeadsoftID
7612
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY <br /> 5 `' STREET SW BRIDGE OVER LATERAL "C" CANAL <br /> 43`d AVENUE BRIDGE OVER SOUTH RELIEF CANAL AND <br /> OLD DIXIE HIGHWAY BRIDGE OVER SOUTH RELIEF CANAL <br /> AMENDMENT NO . 3 TO THE PROFESSIONAL ENGINEERING/LAND SURVEYING <br /> SERVICES AGREEMENT BETWEEN BRIDGE DESIGN ASSOCIATES , INC . AND <br /> INDIAN RIVER COUNTY, FLORIDA. <br /> This is an amendment to the existing Engineering/Land Surveying Services Agreement <br /> (AGREEMENT) dated March 18 , 2003 between Bridge Design Associates , Inc . (ENGINEER) <br /> and Indian River County (COUNTY) . This amendment addresses changes in "Section I" — <br /> "Project Limits and Description" , " Section III - Scope of Services " and " Section V - <br /> Compensation " . <br /> Amendment Description <br /> This Amendment includes the following : <br /> The ENGINEER will perform the necessary engineering services to the Old Dixie Highway <br /> Bridge over South Relief Canal Project by upsizing the drainage pipes to take in offsite drainage <br /> areas . <br /> "SECTION I — PROJECT LIMITS AND DESCRIPTION <br /> The project is located approximately 3300 feet north Along Old Dixie Highway between 2nd <br /> Street SW and 3 `d Place . <br /> The Old Dixie Highway road plans will be modified by upsizing the drainage pipes to take in <br /> offsite drainage areas extending from SW 6th court to Old Dixie Highway between 2nd Street SW <br /> and 1st Street SW . On the north end of the Project, the drainage system will be modified to <br /> include sufficient capacity to convey runoff from the Old Dixie Highway right-of- way to 3rd <br /> Place . On both ends of the Project , the additional drainage areas will be conveyed to the <br /> proposed dry retention areas . <br /> " SECTION III — SCOPE OF SERVICES " is being modified to incorporate the following : <br /> The permits and roadway portion of the plans for the improvement will be modified to take in <br /> offsite drainage areas . The drainage system will be modified to include sufficient capacity to <br /> convey runoff from the Old Dixie Highway right- of-way and off site drainage areas . <br /> Permit modification applications will be prepared and submitted to the St . Johns River Water <br /> Management District , Indian River Farms Water Control District, Corps of Engineers , <br /> Department of Environmental Regulation and any other applicable permits as outlined in the <br /> original AGREEMENT . <br /> S :APERSONNELAKimV2tN1H\September2t918VAmendment#3.dnc <br />
The URL can be used to link to this page
Your browser does not support the video tag.