My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-313
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-313
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 1:06:53 PM
Creation date
10/1/2015 12:41:10 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Third Amendment
Approved Date
09/23/2008
Control Number
2008-313
Agenda Item Number
8.CC.
Entity Name
Bridge Design Assoc.
Subject
Amendment No. 3 5th St.SW Bridge, Old Dixie Highway Bridge
Area
5th St. SW over Lateral C Canal 43rd Ave. over South Relief Can
Supplemental fields
SmeadsoftID
7612
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5617911995 Line 1 01 . 23 : 06 p . m . 09 - 10 - 2008 218 <br /> BRIDGE DESIGN ASSOCIATES , INC . <br /> i <br /> C ON S U LT ING E N G IN E E R S <br /> BRIAN C. RHEAULT, P.E. <br /> President <br /> i <br /> September 10 , 2008 j <br /> Indian River County <br /> 1800 27' Street <br /> Vero Beach , Florida 32960 <br /> ATTENTION : Mike Nixon <br /> i <br /> REGARDING : Old Dixie Highway over South Relief Canal / Revised Proposal <br /> PROJECT NO . : 03-538 <br /> Dear Mike : <br /> Pursuant to your request, Bridge Design Associates , Inc. and Arcadis can perform the requested <br /> scope of work as follows : <br /> We will modify the drainage design to upsize the drainage pipes to take in offside drainage areas <br /> extending from SW 6'h Court to Old Dixie Highway between SW 2"d Street and SW I " Street, On <br /> the north end of the project, the drainage system will be modified to include sufficient capacity to <br /> convey runoff from the Old Dixie Highway right-of-way from the north project limit to 3'd Place . The <br /> plans will be modified to incorporate the appropriate drainage improvements . On both ends of the <br /> project, the additional drainage areas will be conveyed to the proposed dry storm water detention <br /> areas . The size of the detention areas will remain as currently proposed . <br /> Our fees will be as follows : <br /> Bridge Design Associates, Inc. $ 832 . 30 <br /> Arcadis / Design & Permitting $ 101278 . 23 <br /> Permitting Fees 350. 00 <br /> TOTAL $ 117460. 53 <br /> If you have any questions , please give me a call . <br /> Respectfully, <br /> BRIDGE DESIGN ASSOCIATES, INC . <br /> i <br /> lee <br /> i <br /> Brian C . Rheault, P . E . <br /> President <br /> BCR: kedS : 12003-Jobs10M38 Old Dixie over South RelieflCorrespondencelproposal 09- 10-08 . wpd <br /> 1402 Royal Palm Beach Boulevard • Building 200 • Royal Palm Beach, Florida . 33411 <br /> (561 ) 686-3660 • Fax : (561 ) 791 -1995 <br />
The URL can be used to link to this page
Your browser does not support the video tag.