Laserfiche WebLink
BRIDGE DESIGN ASSOCIATES, INC . <br /> S . W. 5TH AVENUE OVER 43RD AVENUE DITCH <br /> June 24 , 2008 <br /> HOURLY BREAKDOWN OF SERVICES - <br /> EXHIBIT "A" <br /> PROJECT PROJECT CADD FIELD TOTAL LABOR <br /> MANAGER ENGINEER TECH REP/ HOURS COST <br /> ACTIVITY E. I . BY BY <br /> ACTIVITY ACTIVITY <br /> $ 130 .50 $ 110.20 $89 . 90 $62 . 35 <br /> Pre-Construction Meeting 5 . 0 5. 0 10 . 0 $964 . 25 <br /> Shop Drawing Reviewes / concrete <br /> mix, test pile, re-cast components 2.0 8 . 0 8 . 0 18 . 0 $ 1 , 641 .40 <br /> Pile Casting / Sheet Piles 1 80. 0 80 . 0 $4 , 988 . 00 <br /> Pile Driving 40.0 40.0 $2 , 494 . 00 <br /> Pile Cas 16. 0 16. 0 $997 . 60 <br /> Prestressed Placement / Closure Pour 12 . 0 12 . 0 $748 .20 <br /> Post Tensioning 5. 0 5 . 0 12 .0 22 .0 $ 1 , 951 . 70 <br /> Sidewalks 8 .0 8 . 0 $498 . 80 <br /> Barriers 16 . 0 16 .0 $997.60 <br /> Approach Slab 16 . 0 16 . 0 $997. 60 <br /> Approach Slab sidewalks 16. 0 16 . 0 $997 . 60 <br /> Approach Slab barriers 24. 0 24.0 $ 1 , 496 .40 <br /> Revetment & misc. pipes 16.0 16.0 $997. 60 <br /> Final Inspection 5. 0 5 . 0 10 . 0 $964 .25 <br /> Final Report & Certification 4 .0 4. 0 $522 . 00 <br /> TOTAL MANHOURS 21 .0 13 . 0 0. 0 274 . 0308 . 0 <br /> DIRECT LABOR COST $2 , 740. 50 $1 ,432.60 $0.00 $ 17 ,083. 90 $21 , 257 . 00 <br /> ENGINEERING FEES $21 , 257. 00 <br /> PDA Test $6,300.00 <br /> 03-537 pro Cps TOTAL $27 , 557. 00 <br />