My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-223
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 1:32:35 PM
Creation date
10/1/2015 12:24:24 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/08/2008
Control Number
2008-223
Agenda Item Number
8.K.
Entity Name
Bridge Design Associates,Inc.
Subject
Work Order No.10 5th St.SW Bridge over 43rd Ave. Canal
Area
5th St. SW Bridge
Project Number
0205
Supplemental fields
SmeadsoftID
7486
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRIDGE DESIGN ASSOCIATES, INC . <br /> S . W. 5TH AVENUE OVER 43RD AVENUE DITCH <br /> June 24 , 2008 <br /> HOURLY BREAKDOWN OF SERVICES - <br /> EXHIBIT "A" <br /> PROJECT PROJECT CADD FIELD TOTAL LABOR <br /> MANAGER ENGINEER TECH REP/ HOURS COST <br /> ACTIVITY E. I . BY BY <br /> ACTIVITY ACTIVITY <br /> $ 130 .50 $ 110.20 $89 . 90 $62 . 35 <br /> Pre-Construction Meeting 5 . 0 5. 0 10 . 0 $964 . 25 <br /> Shop Drawing Reviewes / concrete <br /> mix, test pile, re-cast components 2.0 8 . 0 8 . 0 18 . 0 $ 1 , 641 .40 <br /> Pile Casting / Sheet Piles 1 80. 0 80 . 0 $4 , 988 . 00 <br /> Pile Driving 40.0 40.0 $2 , 494 . 00 <br /> Pile Cas 16. 0 16. 0 $997 . 60 <br /> Prestressed Placement / Closure Pour 12 . 0 12 . 0 $748 .20 <br /> Post Tensioning 5. 0 5 . 0 12 .0 22 .0 $ 1 , 951 . 70 <br /> Sidewalks 8 .0 8 . 0 $498 . 80 <br /> Barriers 16 . 0 16 .0 $997.60 <br /> Approach Slab 16 . 0 16 . 0 $997. 60 <br /> Approach Slab sidewalks 16. 0 16 . 0 $997 . 60 <br /> Approach Slab barriers 24. 0 24.0 $ 1 , 496 .40 <br /> Revetment & misc. pipes 16.0 16.0 $997. 60 <br /> Final Inspection 5. 0 5 . 0 10 . 0 $964 .25 <br /> Final Report & Certification 4 .0 4. 0 $522 . 00 <br /> TOTAL MANHOURS 21 .0 13 . 0 0. 0 274 . 0308 . 0 <br /> DIRECT LABOR COST $2 , 740. 50 $1 ,432.60 $0.00 $ 17 ,083. 90 $21 , 257 . 00 <br /> ENGINEERING FEES $21 , 257. 00 <br /> PDA Test $6,300.00 <br /> 03-537 pro Cps TOTAL $27 , 557. 00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.