Laserfiche WebLink
BRIDGE DESIGN ASSOCIATES , INC . <br /> OLD DIXIE HIGHWAY OVER SOUTH RELIEF CANAL <br /> June 24 , 2008 <br /> HOURLY BREAKDOWN OF SERVICES <br /> EXHIBIT "A" <br /> PROJECT PROJECT CADD FIELD TOTAL LABOR <br /> MANAGER ENGINEER TECH REPT HOURS COST <br /> ACTIVITY E. 1. BY BY <br /> ACTIVITY ACTIVITY <br /> $ 130 . 50 $110 .20 $89 . 90 $62 . 35 <br /> Pre Construction Meeting 5 .0 5.0 10. 0 $ 1 , 203. 50 <br /> Shop Drawing Reviews 8 . 0 16.0 24 . 0 $2 , 807 .20 <br /> Pile Casting / Sheet Pile 2. 0 8 .0 10.0 $719. 20 <br /> Pile Driving 16.0 80. 0 96. 0 1 $6 , 751 .20 <br /> Pile Cas 16.0 24. 0 40. 0 $3 , 259.60 <br /> Pre-stressed decks - casting 8. 0 16 . 0 24. 0 $ 1 , 879. 20 <br /> Pre-stressed decks - piacement 8.0 8 . 0 $498. 80 <br /> Closure pours 8.0 8 . 0 $498. 80 <br /> Post Tensioning 5.0 5 . 0 24. 0 34 . 0 $2 , 699. 90 <br /> End closure pours 8.0 8 . 0 $498. 80 <br /> Sidewalks 16. 0 16 . 0 $997. 60 <br /> Barriers 16. 0 16 .0 $997. 60 <br /> Approach slabs 8. 0 8.0 $498. 80 <br /> Approach slabs sidewalk 8 . 0 8.0 $498. 80 <br /> Approach slabs barrier 8. 0 8 . 0 $498. 80 <br /> Final Inspection 5. 0 5 . 0 10. 0 $964 .25 <br /> Final Report & Certification 8. 0 8 .0 $ 19044. 00 <br /> TOTAL MANHOURS 31 .0 68 . 0 0. 0 237. 0 336. 0 <br /> DIRECT LABOR COST $4 ,045. 50 $7,493.60 $0. 00 $ 14, 776 . 95 $26 , 316 . 05 <br /> ENGINEERING FEES $26, 316 .05 <br /> PDA Test $6 , 300 .00 <br /> 03-538 pro cps TOTAL $32,616.05 <br />