My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-222
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-222
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 1:12:18 PM
Creation date
10/1/2015 12:24:20 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/08/2008
Control Number
2008-222
Agenda Item Number
8.J.
Entity Name
Bridge Design Associates,Inc.
Subject
Work Order No.9 Old Dixie Highway Bridge over South Relief Canal
Area
Old Dixie Highway Bridge
Project Number
0206
Supplemental fields
SmeadsoftID
7485
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRIDGE DESIGN ASSOCIATES , INC . <br /> OLD DIXIE HIGHWAY OVER SOUTH RELIEF CANAL <br /> June 24 , 2008 <br /> HOURLY BREAKDOWN OF SERVICES <br /> EXHIBIT "A" <br /> PROJECT PROJECT CADD FIELD TOTAL LABOR <br /> MANAGER ENGINEER TECH REPT HOURS COST <br /> ACTIVITY E. 1. BY BY <br /> ACTIVITY ACTIVITY <br /> $ 130 . 50 $110 .20 $89 . 90 $62 . 35 <br /> Pre Construction Meeting 5 .0 5.0 10. 0 $ 1 , 203. 50 <br /> Shop Drawing Reviews 8 . 0 16.0 24 . 0 $2 , 807 .20 <br /> Pile Casting / Sheet Pile 2. 0 8 .0 10.0 $719. 20 <br /> Pile Driving 16.0 80. 0 96. 0 1 $6 , 751 .20 <br /> Pile Cas 16.0 24. 0 40. 0 $3 , 259.60 <br /> Pre-stressed decks - casting 8. 0 16 . 0 24. 0 $ 1 , 879. 20 <br /> Pre-stressed decks - piacement 8.0 8 . 0 $498. 80 <br /> Closure pours 8.0 8 . 0 $498. 80 <br /> Post Tensioning 5.0 5 . 0 24. 0 34 . 0 $2 , 699. 90 <br /> End closure pours 8.0 8 . 0 $498. 80 <br /> Sidewalks 16. 0 16 . 0 $997. 60 <br /> Barriers 16. 0 16 .0 $997. 60 <br /> Approach slabs 8. 0 8.0 $498. 80 <br /> Approach slabs sidewalk 8 . 0 8.0 $498. 80 <br /> Approach slabs barrier 8. 0 8 . 0 $498. 80 <br /> Final Inspection 5. 0 5 . 0 10. 0 $964 .25 <br /> Final Report & Certification 8. 0 8 .0 $ 19044. 00 <br /> TOTAL MANHOURS 31 .0 68 . 0 0. 0 237. 0 336. 0 <br /> DIRECT LABOR COST $4 ,045. 50 $7,493.60 $0. 00 $ 14, 776 . 95 $26 , 316 . 05 <br /> ENGINEERING FEES $26, 316 .05 <br /> PDA Test $6 , 300 .00 <br /> 03-538 pro cps TOTAL $32,616.05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.