Laserfiche WebLink
BRIDGE DESIGN ASSOCIATES, INC. <br />OLD DIXIE HIGHWAY OVER SOUTH RELIEF CANAL <br />June 24, 2008 <br />HOURLY BREAKDOWN OF SERVICES <br />EXHIBIT "A" <br />03-538 pro cps <br />ENGINEERING FEES <br />PDA Test <br />TOTAL <br />$26,316.05 <br />$6,300.00 <br />$32,616.05 <br />ACTIVITY <br />PROJECT <br />MANAGER <br />PROJECT <br />ENGINEER <br />CADD <br />TECH <br />FIELD <br />REPT <br />E.1. <br />TOTAL <br />HOURS <br />BY <br />ACTIVITY <br />LABOR <br />COST <br />BY <br />ACTIVITY <br />$130.50 <br />$110.20 <br />$89.90 <br />$62.35 <br />Pre Construction Meeting <br />5.0 <br />5.0 <br />10.0 <br />$1,203.50 <br />Shop Drawing Reviews <br />8.0 <br />16.0 <br />24.0 <br />$2,807.20 <br />Pile Casting / Sheet Pile <br />2.0 <br />8.0 <br />10.0 <br />$719.20 <br />Pile Driving <br />16.0 <br />80.0 <br />96.0 <br />1 $6,751.20 <br />Pile Cas <br />16.0 <br />24.0 <br />40.0 <br />$3,259.60 <br />Pre -stressed decks - casting <br />8.0 <br />16.0 <br />24.0 <br />$1,879.20 <br />Pre -stressed decks - piacement <br />8.0 <br />8.0 <br />$498.80 <br />Closure pours <br />8.0 <br />8.0 <br />$498.80 <br />Post Tensioning <br />5.0 <br />5.0 <br />24.0 <br />34.0 <br />1 $2,699.90 <br />End closure pours <br />8.0 <br />8.0 <br />$498.80 <br />Sidewalks <br />16.0 <br />16.0 <br />$997.60 <br />Barriers <br />16.0 <br />16.0 <br />$997.60 <br />Approach slabs <br />8.0 <br />8.0 <br />$498.80 <br />Approach slabs sidewalk <br />8.0 <br />8.0 1 <br />$498.80 <br />Approach slabs barrier <br />8.0 <br />8.0 <br />$498.80 <br />Final Inspection <br />5.0 <br />5.0 <br />10.0 <br />$964.25 <br />Final Report & Certification <br />8.0 <br />8.0 <br />$19044.00 <br />TOTAL MANHOURS <br />31.0 <br />68.0 <br />0.0 <br />237.0 <br />336.0 <br />DIRECT LABOR COST <br />$4,045.50 <br />$7,493.60 <br />$0.00 <br />$14,776.95 <br />$26,316.05 <br />03-538 pro cps <br />ENGINEERING FEES <br />PDA Test <br />TOTAL <br />$26,316.05 <br />$6,300.00 <br />$32,616.05 <br />