My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-077
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-077
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 10:50:21 AM
Creation date
9/30/2015 6:26:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
04/01/2003
Control Number
2003-077
Agenda Item Number
11.G.2.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Bridge Design Services
Area
82nd Ave
Archived Roll/Disk#
3160
Supplemental fields
SmeadsoftID
3199
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION IV - TIME FOR COMPLETION <br /> The time for completion of the 90% design drawings, permit applications, and Engineer's Opinion of <br /> Probable Construction Cost for the 4`h Street and 4151 Street projects shall be twelve ( 12) months . Once permits are <br /> received, 100% design drawings shall be completed 90 days thereafter. <br /> The time of completion for the 82"a Avenue bridge plans will be six (6) months and begin upon receipt of the <br /> County ' s 30% roadway plans . <br /> SECTION V - COMPENSATION <br /> The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered pursuant to this <br /> Agreement fees in accordance with the following : <br /> A . Professional Services Fee <br /> l . The basic compensation for each project location mutually agreed upon by the <br /> ENGINEER and the COUNTY follows : <br /> 82??d Avenue bridge replacement <br /> Task Fee <br /> Lump Sum Components' <br /> Design Survey $ 6, 190 <br /> Structural Design $45 ,984 <br /> ridge Total $ 52 , 174 <br /> 4`" Street bridge replacement <br /> Task Fee <br /> Lump Sum Components' <br /> Design Survey $4,635 <br /> Roadway Design $ 17, 860 <br /> Drainage Analysis and Permitting $5 , 183 <br /> ride Total $27,678 <br /> 41s' Street bridge replacement <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.