My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-077
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-077
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 10:50:21 AM
Creation date
9/30/2015 6:26:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
04/01/2003
Control Number
2003-077
Agenda Item Number
11.G.2.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Bridge Design Services
Area
82nd Ave
Archived Roll/Disk#
3160
Supplemental fields
SmeadsoftID
3199
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 . The ENGINEER will attend conferences with the COUNTY and its representatives upon <br /> reasonable request. <br /> 3 . In order to accomplish the work described under this Agreement in the time frames and <br /> conditions set forth in this Agreement, the ENGINEER will observe the following <br /> requirements : <br /> a. The ENGINEER will complete his work on the project within the time allowed <br /> by maintaining an adequate staff of registered engineers, draftsmen, and other <br /> employees on the work at all times . <br /> b . The ENGINEER will design the project in such a manner as to be in <br /> conformance with all applicable federal , state and local laws, and shall comply <br /> with the Florida Department of Transportation's Manual on Uniform Minimum <br /> Standards for the Design, Construction , and Maintenance of Streets and <br /> Highways (Green Book), latest edition . <br /> C . The ENGINEER will prepare all necessary sketches and completed application <br /> forms to accompany the COUNTY'S applications for required federal, state, or <br /> local permits . (excluding 82"d Avenue bridge replacement) <br /> d . The ENGINEER will cooperate with the COUNTY in order that all phases of <br /> the work may be properly scheduled and coordinated . <br /> e . The ENGINEER will send a complete preliminary set of construction plans to <br /> any city, county, state or federal regulatory agency from which a permit or other <br /> approval is required prior to final approval of the design by the Director of the <br /> Public Works Department, and will coordinate the project design with all <br /> applicable agencies . <br /> f. The ENGINEER will contact all known utility companies having installations in <br /> the immediate vicinity of the proposed work and consider relocation of utilities , <br /> if necessary. The ENGINEER will provide the COUNTY with necessary <br /> information relative to required utility adjustments, relocations and installations <br /> and will show all utilities on the final design plans . <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.