Laserfiche WebLink
BRIDGE DESIGN- ASSOCIATES, INC. - - _ - - - - - <br /> 13TH STREET AND 58TH AVENUE BRIDGE REPLACEMENT <br /> August 28, 2006 <br /> HOURLY BREAKDOWN OF SERVICES <br /> EXHIBIT 'I <br /> PROJECTI PROJECT CARD FIELD TOTAL LABOR <br /> MANAGER ENGINEER TECH REP/ HOURS COST <br /> ACTIVITY SHEET E.I. BY BY <br /> * I ACTIVi ACTIVITY <br /> $128.00 $104.00 $70A0 358.00 <br /> COORDINATION ti <br /> LIU& Coodination & Soil Testln16.0 24.0 $2,262.00 <br /> Pertnfl Meeti s ! IRFWCD 1 1:11 :1, 111 1 ACOE ! DE WA 4.04.a $51200 <br /> DESIGN - _ - - _ . <br /> General Notes/ Construction Notes / SPWACabons N/A 2.5 8.0 10.5 $1,152.00 <br /> Des' n Sheet Pile wall SI for end hent NIA 12.0 12.0 $1,248.00 <br /> Des' n end bent Pile ca N/A 12o 12.0 $1,248.00 <br /> Dom' n SUPrITStructure deck slab WA 4.0 30.0 34.0 $3,632.00 <br /> Des n closure pours NIA 6.0 6.0 $624.00 <br /> Des' n post tensions stem N/A 8.0 8.0 $832 00 <br /> n barrier system & guardrail WA 2.0 8.0 10.0 $1 ,088.00 <br /> Design sloPe Protection WA 2.0 8.12 10.0 $1 ,086.00 <br /> PLANS PREPARATION <br /> Index Of Sheets / Location Map / Summ of 0 61 6.0 8.0 $4201 <br /> Bridge Cross section eI & prop 8.0 8.0 $680.00 <br /> General Notes / Design Criteria / Constr. Notes 63 4.0 4.0 $280.00 <br /> BriI Plan Sheet 64 15.12 16.0 $1,120.120 <br /> Br1d Elevation B5 6.0 6.D $420.00 <br /> Substructure Plan B6 all 8.0 <br /> Pile Data Table / Soil Borings $520'00 <br /> 67 8.0 6.0 $420.00 <br /> Finish Grade Plan B8 12.0 <br /> End Bent Plan & Elevation 12'0 5240.00 <br /> B98.8 8.0 $580.00 <br /> End Bent details B10 20.0 20.0 $1 ,a0D.oD <br /> SU rstruature !Cal cross seclion B11 8.0 B.0 $42p.pp <br /> Precast slab flayout plan & post tension B12 8.0 8.0 $520.00 <br /> Precast slab plan elevation B13 8.0 <br /> Precast slab details, bar bendi dia 8.12 $52o.DD <br /> B14 30.0 300 $2,100.00 <br /> Sheet ire wan details, notes, etc. 615 16.0 ts.D $1 .120.00 <br /> roach slab ISYOut sheet 616 s.o 6.0 $a2o.oD <br /> Index sheets (600,601 ;614,700-1 ,700-2, 8t0 1117- <br /> 8201 -, 820-2) 624 s.o e,0 $650.00 <br /> MISCELLANEOUS <br /> Quantities & Estimates NIA 2.0 2028.0 $1,858.00 <br /> Qua ' Control / M wlIRC 30%,90%, 100% N/A 4.0 4.0 6.0 14.0 $1 ,276.00 <br /> Permit 822lication & Responses WA 8.0 8.0 8.0 24.0 $2,416.Do <br /> TOTAL MANHOURS 36.5 122.0 185.0 312 .0 373.5 <br /> DIRECT 1A80R COST $4,672.00 $12,888,00 $12,850.00 $1 ,740,00 <br /> 532,850.00 <br /> pm 13th <br /> ENGINEERING FEES $32,050.00 <br />