Laserfiche WebLink
Page 3 of 6 <br /> for the improvements required . Coordinate with the Contractor , as needed, regarding <br /> constructability issues that could influence the feasibility of alternative designs . <br /> 2 . Architectural and Structural Design of Monument Sign — Coordinate with the Contractor to <br /> develop a planning level cost estimate for construction of the monument sign . Cost <br /> estimating to be based on a monument sign similar to the existing monument sign designed <br /> previously for the Indian River County Utility Department ' s Operations Complex . <br /> 3 . LandscaRing — Attend meetings , prepare documentation, and obtain approvals to modify <br /> landscaping to reflect Florida Friendly Landscaping changes requested by Indian River <br /> County subsequent to Contracting . <br /> 4 . Utility Conflict Resolution — Design of a conflict structure to resolve a wastewater force <br /> main and a storm sewer conflict discovered during construction. <br /> 5 . Electrical Power Service — Redesign the FPL service at the site from above ground to below <br /> ground. <br /> 6 . Right-of-Way Improvements — Re- engineering of the following right-of- way improvements <br /> at the direction of Indian River County Engineering: <br /> a . Stormwater crossings under 125`h Drive and 126`h Avenue . <br /> b . Modifications to air relief valve structure . <br /> Please note that all of the design revisions noted above are in response to requests made by the <br /> Indian River County SWDD or by Indian River County Engineering subsequent to issuance of <br /> permits and during construction of the project . <br /> TASK 6 — PERNUTTING <br /> Amendment No . 2 does not require any additional work under Task 6 . <br /> TASK 7 — BIDDING SERVICES <br /> Amendment No . 2 does not require any additional work under Task 7 . <br /> TASK 8 — CONSTRUCTION PHASE SERVICES <br /> Additional work activities to be completed under Task 8 include the following: <br /> 1 . Additional Construction Observation Due to Extended Duration of Project. Provide eight <br /> ( 8 ) months of construction observation and coordination with the Contractor for additional <br /> services provided during the extended duration of the project . Conduct periodic construction <br /> oversight and monitoring. Respond to Requests for Information (RFIs ) from the Contractor, <br /> approve Contractor pay requests and attend monthly coordination meetings with the <br />