My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-246
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-246
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2016 1:20:14 PM
Creation date
10/1/2015 3:52:19 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
09/15/2009
Control Number
2009-246
Agenda Item Number
15.B.5
Entity Name
Brown and Caldwell
Subject
Amendment No.2 to Work Order No.1 Fellsmere Convenience Center
Area
Fellsmere
Supplemental fields
SmeadsoftID
10810
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 6 <br /> for the improvements required . Coordinate with the Contractor , as needed, regarding <br /> constructability issues that could influence the feasibility of alternative designs . <br /> 2 . Architectural and Structural Design of Monument Sign — Coordinate with the Contractor to <br /> develop a planning level cost estimate for construction of the monument sign . Cost <br /> estimating to be based on a monument sign similar to the existing monument sign designed <br /> previously for the Indian River County Utility Department ' s Operations Complex . <br /> 3 . LandscaRing — Attend meetings , prepare documentation, and obtain approvals to modify <br /> landscaping to reflect Florida Friendly Landscaping changes requested by Indian River <br /> County subsequent to Contracting . <br /> 4 . Utility Conflict Resolution — Design of a conflict structure to resolve a wastewater force <br /> main and a storm sewer conflict discovered during construction. <br /> 5 . Electrical Power Service — Redesign the FPL service at the site from above ground to below <br /> ground. <br /> 6 . Right-of-Way Improvements — Re- engineering of the following right-of- way improvements <br /> at the direction of Indian River County Engineering: <br /> a . Stormwater crossings under 125`h Drive and 126`h Avenue . <br /> b . Modifications to air relief valve structure . <br /> Please note that all of the design revisions noted above are in response to requests made by the <br /> Indian River County SWDD or by Indian River County Engineering subsequent to issuance of <br /> permits and during construction of the project . <br /> TASK 6 — PERNUTTING <br /> Amendment No . 2 does not require any additional work under Task 6 . <br /> TASK 7 — BIDDING SERVICES <br /> Amendment No . 2 does not require any additional work under Task 7 . <br /> TASK 8 — CONSTRUCTION PHASE SERVICES <br /> Additional work activities to be completed under Task 8 include the following: <br /> 1 . Additional Construction Observation Due to Extended Duration of Project. Provide eight <br /> ( 8 ) months of construction observation and coordination with the Contractor for additional <br /> services provided during the extended duration of the project . Conduct periodic construction <br /> oversight and monitoring. Respond to Requests for Information (RFIs ) from the Contractor, <br /> approve Contractor pay requests and attend monthly coordination meetings with the <br />
The URL can be used to link to this page
Your browser does not support the video tag.