� a <br /> /07 <br /> ==AT Zook � 33 <br /> lA Document G701 " - 2001 <br /> Change Order <br /> PROJECT (Name and address): CHANGE ORDER NUMBER: 012 OWNER: <br /> Indian River County Jail Expansion DATE: April 17, 2007 ARCHITECT: M <br /> 4055 41 si Avenue <br /> Vero Beach, FL 32960 CONTRACTOR: M <br /> TO CONTRACTOR (Name and address).: ARCHITECT'S PROJECT NUMBER: 04083 FIELD: ❑ <br /> Peter R. Brown Construction, Inc. CONTRACT DATE: lune 07, 2005 <br /> 13830 58th Street North, Clearwater, FL CONTRACT FOR: General Construction OTHER: ❑ <br /> 33760 <br /> THE CONTRACT IS CHANGED AS FOLLOWS: <br /> (Include, where applicable, any undisputed amount attributable to previous$ e_recuted Construction Change Directives) <br /> Furnish and Install: <br /> Item I - One 12 strand single mode fiber cable from Warehouse room H013 to room 164 of SW dorm <br /> Item 2 - One 12 strand single mode fiber cable from Warehouse room HO 13 to room G003 Intake <br /> Item 3 - One 50 pair Cat 3 telephone cable from Warehouse room HO 13 to room G003 Intake <br /> Item 4 - One 24 port fiber patch panel with ST connector at Warehouse room 11013 <br /> Item 5 - One 12 port patch panel with ST connector at room G003 Intake <br /> Item 6 - One 12 port patch panel with ST connector at Warehouse room 164 <br /> Item 7 - One 50 pair Cat 3 telephone cable from room G003 Intake 10 Utilities Building <br /> Item 8 - Termination of fiber to patch panels and termination of 50 pair cable to punch blocks $ 19,451 .49 <br /> RCO # 13 - Additional Systems Conduits $ 12.833.00 <br /> TOTAL $32,284.49 <br /> The original Guaranteed Maximum Price was $ 18,301 ,631 .00 <br /> The net change by previously authorized Change Orders $ ($493,779.35) <br /> The Guaranteed Maximum Price prior to this Change Order was $ 17,807,851 .65 <br /> The Guaranteed Maximum Price will be unchanged by this Change Order in the amount of $ 0.00 <br /> The new Guaranteed Maximum Price including this Change Order will be $ 17,807,851 .65 <br /> The Contract Time will be unchanged by Zero ( 0 ) days. <br /> The date of Substantial Completion as of the date of this Change Order therefore is lune 25, 2007 <br /> NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which <br /> have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and <br /> Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br /> NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br /> Clemons-Rutherford & Asso nc. Peter R. Brown Construction , Inc. Indian River County BOCC <br /> ARCHITECT (Firmin nayr . CONTRACTOR (Firm name) OWNER (Firm name) <br /> 2027 Thomasi11e Rd., Tallah , se , FL 13830 58th Street North , Cle ater, FL 184025th Pqtkjiui1Kt{8, Vero <br /> 32308 3760 Beach <br /> E / ADDRESor AO4 SS <br /> L/ <br /> BY ignature) St u e) <br /> l5 �. <br /> William D. Rutherford Eduardo M. Vargas Gaey C . +u!Aer, Cytai}tnif" <br /> (Typed name) (Typed name) (Typed M ,VV <br /> DATE DATEDAT� r <br /> AIA Document G701T° — 2001 . Copyright 01979 1987, 2000 ad 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA' <br /> Document is protected by U.S. CopyrigM1ltaw and International Treaties. Unauthorized reproduction or distribution of this AIAW' Document, or any <br /> portion of it, may result in severe civil and crimina) pe allies and will be prosecuted to the maximum extent possible under the law. This document <br /> was produced by AIA sonware at 09:59:09 on 06/ // �p7lY.ni 0 1000283091 1 which expires on 2/3/2008, and is not for resale. <br /> User Notes: (2409817590) <br />