My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-133
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-133
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2016 10:08:09 AM
Creation date
9/30/2015 10:43:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
04/17/2007
Control Number
2007-133
Agenda Item Number
7.Q.
Entity Name
Peter Brown Construction
Subject
IRC Jail Expansion Change Order No.012
Area
4055 41st. Ave. IRC Jail
Supplemental fields
SmeadsoftID
6259
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elect� cSolWees Ale, <br /> iNNIMIAL WERCOLEMMUL9eMUTUMMARINNS <br /> EC40001415 EC#0002786 EB#4435 <br /> 1.746 US Hwy 441 / Leesburg, F.I. 34748-7055 <br /> `oeshu '`� Telephone (352) 787-1322 / Fax (352)787-7871 <br /> March 21 , 2007 <br /> Peter & Brown Construction, Inc. <br /> 1383058'aStreet North, Suite 401 <br /> Clearwater, FL. 33760 <br /> Attn: Tim Kelvin <br /> Re: Indian River County Jail Addition <br /> RCO #13 -• Additional Systems Conduits Requested by the Owner <br /> Dear Iim: <br /> Electric Services, Inc. is pleased to offer the following proposal for the above referenced project. Electric Services <br /> supplied all materials, equipment, and lab&necessmy for the complete electrical installation as outlined below and <br /> per the in field conversations with Peter Brown. Construction and the Owner for the completion of the additional <br /> systems conduits required All new work matched the existing facility, <br /> Included in this proposal are all raceways, boxes, straps, and pull strings for the following: <br /> • Add one 4" conduit from (3003 to duct bank pull box outside the warehouse building <br /> • Add one 4" conduit from existing sallyport telephone room to duct bank pull box outside the warehouse <br /> building. <br /> • Add one 2" conduit from existing sallyport telephone room to room (3003 . <br /> • Extend 2" conduit for DDC panel from room G000 to- roam G001 <br /> • Add telephone backboard 4' x 8' b3roomG003 on the West wail.. <br /> • Add two 2" conduits fiom communication room 151 in the West building to communication room 116 in <br /> the East building. <br /> All additional work was not part of ESL's scope as stated in the specifications, on the drawings, and per my <br /> conversations with Peter Brown Constmctioa. This work is complete and has been accepted by PRBC and the <br /> Owner. <br /> This proposal includes all applicable taxes, freight costs, rental equipment, cutting, fire-proofing, and patching as <br /> requested. Electric Services reserves the right to modify this request for unforeseen contingencies <br /> LYem S Description of Work Cost <br /> 1 Additional Systems Conduits RNuested by the Owner __ _ $12,833.00 <br /> This proposal is only valid through April 6, 2007. If accepted after this date, additional costs may apply. Please do <br /> not hesitate to contact me (352-26714814) if you have any questions or if I can further assist you in any way. <br /> Respectfully, <br /> f ,r Authorization Signature: <br /> Printed Signature: ---- _ <br /> Cory Gibbs Date. — — <br /> Project Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.