'AIA Document G701 � - 2001 a r' <br /> Change Order 3� S 22, c \"\ OUG s ( o <br /> 02,0- I 3 <br /> PROJECT (Name and address): CHANGE ORDER NUMBER: 014 OWNER: <br /> Indian River County Jail Expansion DATE: November 8, 2007 ARCHITECT: <br /> 4055 41 st Avenue <br /> Vero Beach, FL 32960 CONTRACTOR: ED <br /> TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: 04083 FIELD: ❑ <br /> Peter R. Brown Construction,]Inc. CONTRACT DATE: June 07, 2005 <br /> 13830 58th Street North, Clearwater, FL CONTRACT FOR: General Construction OTHER: ❑ <br /> 33760 <br /> THE CONTRACT IS CHANGED AS FOLLOWS: <br /> (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) <br /> Item 1 Provide all labor, materials and equipment to install a canopy at the sheriffs Office Auto Maintenance Garage <br /> on.the west side:of the building. The design was per the County's requirements. Work includes providing signed and sealed <br /> drawings for permitting, installing concrete footings, posts, decking and sealants. Canopy is to be 100 lineal feet long and <br /> 23 feet wide. Funding for this work is from the Project Budget and specifically the Contractor's Contingency. <br /> TOTAL $78,925.00 <br /> Acceptance of this change order will not change the Guaranteed Maximum Price but the Contractors Contingency will be <br /> reduced.by $78,925.00. <br /> "elite project's substantial completion date of September 10, 2007 remains unchanged. This work will take place after that <br /> date and will be substantially complete forty-five (45) days after delivery of materials. <br /> The original Guaranteed.Maximum Price was $ 18,301 ,631 .00 <br /> The net change by previously authorized Change Orders $ (493,779.35) <br /> The Guaranteed Maximum Price prior to this Change Order was $ 17,807,851 .65 <br /> The Guaranteed Maximum Price willbe unchanged by this Change Order in the amount of $ 0.00 <br /> The new Guaranteed Maximum Price including this Change Order will be $ 17,807,851 .65 <br /> The Contract Time will beunchanged by Zero ( 0 ) days. <br /> The date of Substantial Completion as of the date of this Change Order therefore is September 10, 2007 <br /> NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which <br /> have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and <br /> Contractor; in which case a Change Order is executed to supersede the Construction Change Directive. <br /> NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br /> Clemons-Ri h rford & A sociates, Inc. Peter R. Brown Construction, Inc. Indian River County BOCC <br /> ARCHIT (Firm name CONTRACTOR (Firm name) OWNER (Firm name) <br /> 2027 t masvilIeRd , T assee, FL 13830 58th Street North, Clearwater, FL 1801 27" Street <br /> 3 33760 Vero Beach, FL ..32960 , E _ <br /> - -ADD ADDRESS ADDRESS ��//jj'' , {1-1,1, <br /> ( i 4 <br /> ( ign re) gnatu BY ('51naturre) <br /> William D. Rutherford Bdazdo M. Vargas Birt dra* V6 >;`I5haiPin'zyj' <br /> (Typed <br /> re) (Typed name) (Typed name) - <br /> L <br /> DAT DATE DATE <br /> AIA Document G701TM - 2001 . Copyright 01979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This A10 <br /> Document is protected by U.S. Copyright Law and International Treatles. Unauthorized reproduction or distribution of this AIA` Document, or any <br /> portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document <br /> was produced by AIA software at 13:28:41 on 02/07/2008 under Order No.1 000337851 —1 which expires on 1/10/2009, and is not for resale. <br /> User Nates: (2125370166) <br />