Laserfiche WebLink
r <br /> Task 2 . 1 - Financial Assurance Report <br /> CDM will prepare documentation that demonstrates proof of financial assurance for the cost of <br /> closing and providing long-term care for the Class I Landfill, the C &D Debris Landfill, and the <br /> Waste Tire Processing Center . This documentation will be submitted for review by the SWDD <br /> and IRC Finance Department. Six copies of the final document will be provided to SWDD . CDM <br /> will meet with SWDD up to six times to discuss issues and to provide needed coordination . <br /> CDM will also respond to FDEP correspondence regarding financial assurance . <br /> Task 2 .2 - Survey and Airspace Assessment <br /> CDM will provide surveys and assessments of consumed airspace, performed by Masteller, <br /> Moler, Reed & Taylor, Inc . for the Class I and C &D Landfills . The survey work for the Class I <br /> waste area will include a complete topographic survey of Segments I and II as well as the <br /> ditches and roadways surrounding the Class I area . The topographic survey of the C &D <br /> Landfill site will include the waste area, as well as the fence-line and the surrounding ditches <br /> and berms adjacent to the C &D site and the C &D expansion area . CDM will review the <br /> volumetric modeling and include a summary of estimated waste density based on the results of <br /> the survey and volumetric modeling . <br /> The deliverable from Masteller, Moler, Reed & Taylor, Inc . will consist of a survey report <br /> identifying the dates the field survey was completed . Airspace consumed and remaining <br /> airspace based on construction and design criteria shall be specifically identified . The survey <br /> report shall also include the results of the volumetric calculations for the Segment II portions of <br /> the Class I landfill, as well as the C &D Landfill and the new C&D expansion area . Deliverables <br /> accompanying the report shall include : <br /> A 1 -inch = 50 feet scale contour map for each site with 1400t contour intervals in regular weight <br /> lines, and 5400t contour intervals in bold weight lines . Signed and sealed contour maps will be <br /> provided on 24-inch by 364nch paper of each landfill site in 14nch = 200 feet scale . A CD with <br /> ASCII file of the survey data in AutoCAD 2004 will also be provided . <br /> For the Class I Landfill (Segment I and 11), the report shall include an evaluation of the <br /> compaction of the waste and an analysis as to whether Waste Management Inc . is meeting its <br /> contractual compaction requirements . CDM will include escrow account balance <br /> recommendations for Fiscal Year 2008-2009, as well as escrow account budget recommendations <br /> for Fiscal Year 2009-2010 . <br /> TASK 3 . 0 - GENERAL TECHNICAL ASSISTANCE <br /> CDM will provide general technical assistance to IRC SWDD staff on an as needed basis . SWDD <br /> staff are performing a number of the tasks required annually by the current FDEP landfill <br /> permits . CDM will provide support as needed for the SWDD staff as they perform these tasks . <br /> Each task will be authorized and documented up to the budgeted amount for this task . General <br /> technical assistance tasks may include review of compliance reports, attendance of meetings <br /> with regulatory agencies, and attendance of miscellaneous meetings and workshops . <br /> A- 2 j12164.docm <br />