Laserfiche WebLink
EXHIBIT A <br />SCOPE OF PROFESSIONAL SERVICES <br />INDIAN RIVER COUNTY SOLID WASTE DISPOSAL DISTRICT <br />ENGINEERING SERVICES FOR ANNUAL PERMITTING SERVICES -2007 <br />AMENDMENT NO. 1 -DETAIL COST ESTIMATE <br />PROJECT UNDERSTANDING <br />Each year Indian River County (IRC) Solid Waste Disposal District (SWDD) is required to <br />document environmental compliance in accordance with several different permits. CDM assists <br />SWDD with some of these submittals to the Florida Department of Environmental Protection <br />(FDEP) each year including Full Cost Accounting and Financial Assurance. <br />SWDD operates a Class I landfill through a contract with Waste Management Inc. and operates <br />a Construction and Demolition (C&D) Debris Landfill facility. SWDD is required by Chapter 62- <br />701, FAC to provide financial assurance for each of these facilities annually. On August 30, 2007 <br />CDM submitted the required FDEP Financial Assurance Cost Estimate Forms for Segments I, <br />IIA, IIB, and IIC of the Class I landfill, the C&D debris landfill, and the Segment I C&D debris <br />cell. In a letter dated September 24, 2007 the FDEP requested the IRC SWDD submit a new <br />detailed financial assurance cost estimate of the entire Class I landfill disposal area. The FDEP <br />requested that the following items be included in the detailed cost estimate: <br />1. Description of which parts of the disposal area have approved capping systems. <br />2. Description of which parts of <br />the disposal area <br />will be capped <br />with a geomembrane and <br />which will have soil cover. <br />3. Drawings (plan and elevation views) clearly showing the location of each capping <br />system. <br />The additional information requested by FDEP will be provided in Task 2.3. <br />Task 2.3 - Detailed Cost Estimate <br />CDM will prepare a new detailed cost estimate for the entire Class I landfill disposal area as <br />requested by FDEP. CDM will provide a description of which parts of the disposal area that <br />already have approved capping systems (soil cover or geomembrane) and describe which parts <br />of the disposal area will be capped with a geomembrane. CDM will work with IRC SWDD in <br />obtaining the drawings requested by FDEP. IRC SWDD will be responsible for providing the <br />drawings requested by FDEP in Item No. 3 above. Budget to produce new drawings is not <br />included in this amendment. CDM will respond to FDEPs September 24, 2007 letter with <br />supporting documentation. <br />A-1 jbuo3.doc <br />