My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-247
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-247
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2016 11:01:10 AM
Creation date
9/30/2015 6:47:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
09/16/2003
Control Number
2003-247
Agenda Item Number
14.B.6
Entity Name
Camp Dresser & McKee
Subject
Engineering Work Authorization B/Scope of Services
Attachment C-1 & C-2 Budget
Archived Roll/Disk#
3162
Supplemental fields
SmeadsoftID
3403
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT B <br /> SCOPE OF SERVICES AND PROJECT SCHEDULE <br /> INDIAN RIVER COUNTY SOLID WASTE DISPOSAL DISTRICT <br /> ENGINEERING SERVICES FOR <br /> LANDFILL GEOTECHNICAL EVALUATION <br /> PROTECT UNDERSTANDING <br /> Indian River County (IRC) is interested in modifying the design of the final landfill scope <br /> geometry to provide more air space in the landfill . CDM will provide consulting services to <br /> evaluate the feasibility of modifying the Class I Landfill sideslopes to increase the amount of <br /> airspace available . The current design includes 3H : 1V side slopes with terraces every 20 feet of <br /> vertical rise . The proposed geotechnical evaluation will consider a range of revised slopes and <br /> terrace locations and widths to increase the air space in the landfill. In addition, preparation of a <br /> permit application to modify the Class I Operations permit is included as Task 2 . 0 in this <br /> proposal . <br /> TASK 1 . 0 - LANDFILL GEOTECHNICAL EVALUATION <br /> The following is the proposed scope of work for the geotechnical evaluation. This proposal <br /> assumes that we can base the evaluation on existing geotechnical data and reports and that we <br /> will need only a limited field investigation. This work is expected to proceed with the following <br /> subtasks : <br /> ■ Review available information including design documents and previous geotechnical <br /> reports . We will visit the site to observe site conditions . We have assumed that there is <br /> sufficient available geotechnical information and that no additional field or laboratory <br /> investigations are needed . <br /> ■ Estimate settlement of the final cover system based on the revised slope geometry . <br /> ■ Perform global stability analyses of the landfill mass . <br /> ■ Perform veneer stability analyses of the proposed cap system. <br /> ■ Evaluate settlement-induced strain in the liner due to foundation settlement. <br /> ■ Evaluate the Geocomposite drainage layer . <br /> ■ Prepare a letter report presenting the results of our analyses . <br /> TASK 2 . 0 - LANDFILL OPERATIONS PERMIT MODIFICATION <br /> CDM will prepare a modification of the IRC SWDD Landfill Class I Operations permit which <br /> includes the results of the landfill geotechnical evaluation approved by IRC . This proposal has <br /> been budgeted on the assumption that Florida Department of Environmental Protection (FDEP) <br /> B-1 rb4475 .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.