Laserfiche WebLink
electronic format for use by WTP operators. In an effort to promote conservation of resources, <br />the final plan will be produced in a 2 -sided format and CDM will limit the number of hard <br />copies of the final plan to 2. CDM will provide a CD containing a portable document format <br />(PDF) of the plan for electronic review by additional parties. <br />TASK 3.0 CONTRACT NEGOTIATION SERVICES <br />The County intends to piggy -back an existing contract between the City of Palm Bay Utility <br />Department and AMPS, Inc. to provide maintenance services for the County's two wellfields. <br />The existing contract in place with Palm Bay is a five-year contract that is renewed on an annual <br />basis. CDM will review contract documents, provide coordination with AMPS and/or the City <br />of Palm Bay, and general assistance to the County as needed to finalize the contract agreement. <br />This task includes up to one meeting with County staff and the City of Palm Bay and/or AMPS. <br />TASK 4.0 GENERAL SERVICES DURING SCHEDULED MAINTENANCE <br />CDM will oversee the daily activities of the contractor on behalf of the County. Activities to be <br />performed under this task pertain solely to the scheduled maintenance activities identified in <br />the wellfield maintenance program plan developed in Task 2.0. Since the extent of the activities <br />to be performed will remain unknown until preparation of the plan is complete, this Task has <br />been budgeted as an upper limit task with an allowance of $25,000. Additional services may be <br />required based on the recommendations of the plan and will be negotiated as an amendment to <br />this Work Order, if needed. <br />TASK 5.0 PROVISIONS FOR EMERGENCY REPAIR SERVICES <br />CDM will provide construction oversight on behalf of the County for the completion of any <br />emergency situations that may arise. Such instances may include failure of the well pump, line <br />shaft, instrumentation, presence of abnormally high solids (i.e. sand in the cartridge filters) or <br />any situation indicative of problems with the wells. CDM will coordinate emergency services <br />with the well contractor and arrange for mobilization as soon as possible to mim,,,;ze potential <br />downtime of the WTP(s). The nature of this task does not allow for CDM to quantitatively <br />identify the emergency services to be provided over the 1 -year life of the contract. Therefore, <br />this task has been budgeted with an upper limit allowance of $15,000. If no emergency issues <br />arise, this budget allocation will not be billed to the County. <br />TASK 6.0 MISCELLANEOUS SERVICES <br />CDM will provide assistance with miscellaneous issues related to well/wellfield management, <br />maintenance and operations as they arise. This task will include permitting issues related to <br />maintenance activities (i.e. coordination of disinfection reporting to FDEP, if needed, after <br />installation of new well components), field visits to investigate problems reported by County <br />staff, and miscellaneous services requested by County staff. This task has been budgeted as an <br />upper limit line item allowance of $15,000, to be used on an as -needed basis only upon approval <br />of the Director of Utility Services. Should a miscellaneous task arise for which there is <br />insufficient budget remaining, additional funds will be negotiated at that time to complete the <br />task. <br />OTHER SERVICES NOT INCLUDED IN THIS SCOPE OF SERVICES <br />This authorization does not include: <br />■ Full-scale design services for major issues, such as replacement wells; <br />■ Consumptive use permitting associated with increased pump/ well capacity or new wells; <br />A-3 jb1800.doc <br />