Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
06/ 19 / 2003 14 : 15 3864627748 ECOSYSTEM RESEARCH <br /> PAGE 01 <br /> EC0SVSTV%4 TtESIEATuH CORPORATION <br /> 2906 Norfhw¢st 142»z) Ave"i4e <br /> now GaIVICSv01 ¢ , �FlMlba 32609 -4026 <br /> (3sG) 4b2 -loos <br /> June 19, 2003 <br /> Dr. Larry Schwartz, PWS <br /> Mr. John Ladner <br /> CAMP DRESSER & McKEE INC. <br /> 2301 Maitland Center Drive, Suite 300 <br /> Maitland, FL 32751 <br /> Re : IRC Wetlands Cost Proposals <br /> Dear Larry/John : <br /> Attached you will find 3 proposals (20034, 2003 - 51 2003- 6 ) to do the following work: <br /> PROPOSAL 2003-4: <br /> Includes jurisdiction work and T& E survey of = 200 acres of northern expansion area . <br /> Jurisdiction work includes review of established survey line in Tracts 3 , 5 , 61 7 East, and 2 West (see <br /> Figures 1 -3 ). In these areas, I will review line and make minimal adjustments. In Tract 7 West, I will <br /> flag previously unflagged line . Please be advised that Jim delineated wetlands in middle of 100-year <br /> drought. If major modifications are required, major time modifications may be required . <br /> In all tracts we will perform gopher tortoise survey, general T& E animal and plant survey, and <br /> prepare map with GPS coordinates of all burrows , etc . <br /> PROPOSAL 2003-5: <br /> Details expenses for ecological survey of 43 -acre mitigation site and flagging of 4400 feet of <br /> wetlands line. <br /> PROPOSAL 2003-6 : <br /> Details expenses formeetingwith FDEP, estimated at2 days, to reviewsite and wetlands lines . <br /> do not think ACOE will have jurisdiction over the wetlands on site due to recent SWANK ruling, <br /> Please be advised that wetlands flagging does not include = 1 mile of ditches (C4 and C5 canals) , <br /> which I assume will be bank to bank jurisdiction and can be surveyed . <br /> E):\ DaWNcdm proposal cover letter.wpd <br />