My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-086
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 10:43:20 AM
Creation date
9/30/2015 7:28:49 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
04/13/2004
Control Number
2004-086
Agenda Item Number
11.J.2
Entity Name
Camp Dresser & McKee
Subject
Work Authorization No.1
North County Water Treatment Plant Expansion
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3734
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 . Bench scale and pilot plant scale testing to determine membrane performance will not be <br /> performed during this authorization. CDM will utilize full scale operating plant data in <br /> conjunction with reasonably conservative design criteria in the final design of the Phase <br /> II improvements . <br /> 3 . The existing facilities must remain in service during construction of the herein described <br /> Phase II improvements. Construction will be phased to incorporate two new skids in the <br /> existing process bay first, then bring the remaining new skid on-line upon completion of <br /> the new process bay . <br /> The primary intent of this effort is to provide Contract Documents suitable for obtaining <br /> construction bids (one contract) for the North County Water Treatment Plant - Phase II <br /> Expansion improvements (within the fence) . Well and raw water piping offsite or outside the <br /> fence to be designed and bid by others . In general the new or modified facilities include the <br /> following items : <br /> Raw Water Supply System <br /> ■ Add three new 2 . 14 mgd upper Floridian aquifer production wells (including meters, <br /> telemetry, well pumps, etc . ) . (TO BE DONE BY OTHERS) <br /> ■ Add new raw water system supply piping from the new wells to the existing system or <br /> process building. Piping outside fence or offsite to be done by others . <br /> ■ Replace existing raw water main piping entering process building. <br /> Pretreatment System <br /> ■ Add three new 1 ,300 gpm booster pumps with VFD / MCC . <br /> ■ Add three new 2 mgd (each) vertical cartridge filter housings (2 in existing, 2 in new <br /> process bay) . <br /> ■ Add new external self-cleaning automatic sand strainer sized for the entire process flow <br /> (plant build out) . <br /> Membrane Process and Administration Building <br /> ■ Expand existing Membrane Process and Administration Building to provide space for <br /> up to eight total skids and associated electrical/ control/ administrative area. Interior <br /> and exterior architecture will match that of the existing facilities . <br /> ■ Add two new 1 . 5 mgd (each) capacity membrane skids in existing Membrane Building <br /> with local instruments and controls . <br /> ■ Replace the membranes in the existing two skids . <br /> ■ Add one new 1 .5 mgd capacity (each) membrane skid in new membrane processing <br /> building with local instruments and controls . <br /> ■ Add a new static mixer sized for plant build-out. <br /> ■ Add new process piping sized for plant build-out. <br /> ■ Expand the central computer control system sized for plant build-out. <br /> ■ Add new raw, product, and concentrate water instrument panels for plant build-out. <br /> ■ Add new transformer/ switchgear sized for plant build-out. <br /> ■ Add new or upgrade existing emergency power generator . <br /> ■ Add concentrate treatment system for plant build-out. <br /> ■ Expand existing membrane cleaning system. <br /> B-2 mh1534. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.