My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-086
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 10:43:20 AM
Creation date
9/30/2015 7:28:49 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
04/13/2004
Control Number
2004-086
Agenda Item Number
11.J.2
Entity Name
Camp Dresser & McKee
Subject
Work Authorization No.1
North County Water Treatment Plant Expansion
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3734
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t ' <br /> anticipated new facilities as well as recommendations resulting from the availability of new <br /> equipment and recent design preferences of IRC . <br /> Specific products of this task include draft and final Preliminary Design Report Update, <br /> Geotechnical (Soils) Report, Topographic Survey, and Preliminary Site Plan Approvals . <br /> Subtask 1 . 1 Preliminary Design Report Review and Update <br /> CDM will provide the following services related to the review of the existing <br /> Preliminary Design Report prepared by CDM in September 1995 : <br /> A . Conduct a review workshop with IRC staff to obtain comments on the existing <br /> Preliminary Design Report and desired changes to design criteria and/ or new <br /> design preferences . <br /> B . Review the existing Preliminary Design Report limiting the review to <br /> confirmation of the presented design criteria, proposed new facilities, and <br /> proposed new equipment. In addition, consider the availability of newer <br /> generation equipment as well as new design preferences recently adapted or <br /> expressed by IRC . <br /> C . Prepare and submit five copies of a draft Preliminary Design Report Update to <br /> IRC for review . Update will include narrative related to maintaining operations <br /> at the current facility while constructing the new facilities . Conduct meeting with <br /> IRC to discuss modifications to the Preliminary Design Report. <br /> D . Prepare and submit final Preliminary Design Report update to IRC incorporating <br /> written comments . This letter and the final Preliminary Design Report will serve <br /> as the basis of design and will be utilized in the permitting process . <br /> Subtask 1 . 2 Geotechnical Investigations <br /> CDM will provide the following services through a Subcontractor related to <br /> geotechnical (soil) investigations : <br /> A . Review previous geotechnical investigations at the plant site . Perform additional <br /> necessary subsurface explorations at the site, necessary for the development of <br /> design criteria for the anticipated new structures . <br /> B . Perform standard penetration tests and split-spoon sampling within the borings <br /> at regular intervals . <br /> C. Perform classification tests on selected samplings obtained from the borings . <br /> D . Visually classify soil samples in general accordance with the United Soil <br /> Classification System and prepare Test Boring Records . <br /> B-4 mhl534. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.