My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-086
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 10:43:20 AM
Creation date
9/30/2015 7:28:49 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
04/13/2004
Control Number
2004-086
Agenda Item Number
11.J.2
Entity Name
Camp Dresser & McKee
Subject
Work Authorization No.1
North County Water Treatment Plant Expansion
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3734
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e r <br /> divisions, three-part format. The design shall be complete including (as applicable to the <br /> Project) site improvements, building, appurtenances, process and ancillary equipment, <br /> accessories, wiring, piping, foundations, substructures, electrical controls, <br /> instrumentation, metering, and all mechanical facilities . The design shall also include <br /> detailed drawings, specifications, tables, charts, schedules, and other documentation as <br /> may be necessary for the Project. A preliminary list of drawings assumed for this Scope <br /> of Services is attached as Table B-1 . The list of drawings may change as the design <br /> occurs and the final list will include necessary drawings required for the WTP <br /> expansion. <br /> Subtask 2. 2 Periodic Review of Work Progress <br /> At approximately the 30 percent, 60 percent, and 90 percent completion levels of the <br /> contract documents, CDM will submit five sets of progress drafts of the contract <br /> documents to IRC staff for review, schedule, and conduct a review meeting with IRC <br /> staff, and address appropriate IRC review comments . <br /> Subtask 2. 3 Final Contract Document Submittal <br /> CDM will submit five sets of final contract documents to IRC staff prior to bidding <br /> advertisement for the project. <br /> Subtask 2.4 Probable Construction Cost <br /> CDM will prepare an opinion of the probable construction cost at the 60 percent and 90 <br /> percent completion levels for the Project. The final estimate of probable construction cost <br /> shall be delivered to IRC staff prior to the opening of bids for the project. <br /> TASK 3 . 0 PERMITTING SERVICES <br /> This task provides for the preparation of necessary permit applications, meetings, and <br /> negotiation with regulatory agencies and preparation of responses to Requests for Additional <br /> Information (RAI) . <br /> CDM will prepare applications for permits as may be required and related to this project. <br /> Permit-related work shall include furnishing required data, drawings, and other information <br /> requested and assisting IRC to obtain required permit approvals . CDM will submit permit <br /> applications to IRC for review and meet with IRC as required to discuss the review comments . <br /> CDM will revise the applications as required and submit to appropriate regulatory agencies for <br /> review and approval. The permits to be obtained could include the following : <br /> ■ Florida Department of Environmental Protection (FDEP) will require a permit to <br /> construct plant process and site improvements . <br /> ■ St. John' s River Water Management District (SJRWMD) and IRC Engineering <br /> Department will require an Environmental Resources Permit (ERP) for modifications to <br /> the existing stormwater drainage system at the plant site . The existing permit is a <br /> Management and Storage of Surface Water (MSSW) permit that was issued in 1996 . <br /> B-6 mh1534. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.