Laserfiche WebLink
Task 2.1 - Financial Assurance Report <br /> CDM will prepare documentation that demonstrates proof of financial assurance for the cost of <br /> closing and providing long-term care for the Class I Landfill, the C&D Debris Landfill, and the <br /> Waste Tire Processing center. This documentation will be submitted for review by the SWDD <br /> and IRC Finance Department. Six copies of the final document will be provided to SWDD. CDM <br /> will meet with SWDD up to six times to discuss issues and to provide needed coordination. <br /> CDM will also respond to FDEP correspondence regarding financial assurance. <br /> Task 2.2 - Survey and Airspace Assessment <br /> CDM will provide surveys and assessments of consumed airspace, performed by Erdman <br /> Anthony of Florida, Inc . for the Class I and C&D Landfills. The survey work for the Class I <br /> waste area will include a complete topographic survey of the `Infill' , the entire Segment I cell, <br /> as well as the ditches and roadways surrounding the Class I area. The topographic survey of the <br /> C&D Landfill site will include the waste area, as well as the fence-line and the surrounding <br /> ditches and berms adjacent to the C&D site and the C&D expansion area. CDM will review the <br /> volumetric modeling and include a summary of estimated waste density based on the results of <br /> the survey and volumetric modeling. <br /> The deliverable from Erdman Anthony of Florida, Inc. will consist of a survey report identifying <br /> the dates the field survey was completed. Airspace consumed and remaining airspace based on <br /> construction and design criteria shall be specifically identified. The survey report shall also <br /> include the results of the volumetric calculations for the Segment II portions of the Class I <br /> landfill, as well as the C&D Landfill and the new C&D expansion area. Deliverables <br /> accompanying the report shall include: <br /> A 1-inch = 50 feet scale contour map for each site with 1-foot contour intervals in regular weight <br /> lines, and 5-foot contour intervals in bold weight lines. Signed and sealed contour maps will be <br /> provided on 24-inch by 36-inch paper of each landfill site in 1-inch = 200 feet scale. A diskette or <br /> CD with ASCII file of the survey data in AutoCAD 2004 will also be provided . <br /> For the Class I Landfill, the report shall include an evaluation of the compaction of the waste <br /> and an analysis as to whether Waste Management Inc. is meeting its contractual compaction <br /> requirements. For the C&D site, an evaluation of footprint and side slopes shall be provided, <br /> with an analysis as to whether the site is being operated and constructed in accordance with the <br /> permitted design. CDM will include escrow account balance recommendations for Fiscal Year <br /> 2007-2008, as well as escrow account budget recommendations for Fiscal Year 2008-2009 . <br /> TASK 3.0 - GENERAL TECHNICAL ASSISTANCE <br /> CDM will provide general technical assistance to IRC SWDD staff on an as needed basis. SWDD <br /> staff are performing a number of the tasks required annually by the current FDEP landfill <br /> permits. CDM will provide support as needed for the SWDD staff as they perform these tasks. <br /> Each task will be authorized and documented up to the budgeted amount for this task. General <br /> technical assistance tasks may include review of compliance reports, attendance of meetings <br /> with regulatory agencies, and attendance of miscellaneous meetings and workshops. <br /> A-2 bi si s.doc <br />