Laserfiche WebLink
EXHIBIT 1 <br /> SCOPE OF WORK <br /> INDIAN RIVER COUNTY <br /> SOUTH COUNTY WATER TREATMENT PLANT <br /> DESIGN, PERMITTING, BIDDING AND CONSTRUCTION SERVICES FOR CONSTRUCTION <br /> OF PROPOSED WELL NO . 7 <br /> BACKGROUND <br /> Indian River County Department of Utility Services (County) owns and operates the South <br /> County Water Treatment Plant (WTP) which currently operates with six existing Upper <br /> Floridan Aquifer (UFA) production wells . The existing Consumptive Use Permit (CUP) for the <br /> South County WTP also includes a future permitted seventh well that has not yet been <br /> constructed due to previous concerns over the potential impacts of the well on neighboring <br /> citrus operations to the south in St. Lucie County; however, both the St. Johns River Water <br /> Management District (SJRWMD) and the South Florida Water Management District have <br /> recently encouraged the County to pursue construction of Well No. 7 as citrus operations have <br /> dwindled south of the County line . <br /> The following is the scope of services to be provided under this authorization. <br /> SCOPE OF SERVICES <br /> CDM will perform the following task services . <br /> TASK 1 . 0 PRE-APPLICATION MEETING WITH SJRWMD <br /> CDM will prepare for and participate in a pre-application CUP meeting with SJRWMD to <br /> discuss the potential locations for Well No . 7. It is assumed that this meeting will be held at the <br /> Palm Bay Operations Center for SJRWMD and will involve two CDM employees in addition to <br /> County staff. <br /> TASK 2 . 0 SITING OF WELL <br /> CDM will rely on the existing groundwater models, proposed location in the existing CUP and <br /> discussions with SJRWMD to determine the ultimate location of Well No. 7. The existing <br /> model (s) assumed a particular location for the new well, and in an effort to minimize the need <br /> for additional modeling, CDM will assume that the modeled location is acceptable to the <br /> County and proceed accordingly. CDM will prepare proposed location figures for Well No . 7 <br /> for the basis of discussion at the pre-application meeting described in Task 1 .0. <br /> It is anticipated that the County will coordinate with the Parks and Recreation Department to <br /> confirm that the ultimate location for Well No . 7 will be compatible with future development <br /> plans of the South County Park. CDM' s involvement in negotiating with the Parks and <br /> Recreation Department will be on an as needed basis only. The assumptions made in this task, <br /> should CDM' s assistance be needed , are that CDM will conduct one coordination meeting and <br /> schedule one site visit with the Parks and Recreation Department prior to finalizing the well <br /> location, in the event that this has not yet been conducted during the modeling process by other <br /> consultants. Upon finalization of the well locations, CDM will contract with a surveyor to <br /> survey the well location and the proposed piping corridors for use in preparing the contract <br /> A4 j12355.doc <br />