My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-267
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-267
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2016 11:33:16 AM
Creation date
9/30/2015 6:59:11 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i. Assist the COUNTY with review of Contractor ' s pay requests and make <br /> recommendations for payment. <br /> j . Evaluate and approve/disapprove all testing results and make recommendations to the <br /> COUNTY. <br /> k. Furnish consultation regarding interpretation of any and all parts of the project plans , <br /> specifications , permits and Contract Documents . <br /> 1. Review for comment or approval any and all proposal requests, supplemental <br /> drawings and information, and change orders . <br /> in. Coordinate with Utilities regarding conflict resolution, relocation and/or <br /> abandonment of existing facilities . <br /> n. Conduct final inspection of the project for compliance with the Contract Documents, <br /> prepare final "punch" list, and provide additional inspection to verify completeness <br /> of items identified in "punch" list. <br /> o . Prepare "record" drawings based on information provided by Utilities . <br /> p . Perform an "as-built" survey of constructed improvements including inverts of all <br /> storm sewer piping at structures . Surveyed information to be inserted on design <br /> drawings for submittal as required in conjunction with final certifications to <br /> permitting agencies . The survey shall be the minimum required for project <br /> certification. <br /> q. Prepare and submit final certifications to permitting agencies . <br /> SECTION IV - TIME FOR COMPLETION <br /> The time for completion of the 90% design drawings (preliminary drawings) , permit applications, and <br /> Engineer's Opinion of Probable Construction Cost shall be six (6) months . Once permits are received, 100% design <br /> drawings (final drawings) shall be completed 60 days thereafter. Construction Phase services shall begin with <br /> bidding, and shall be completed within two (2) years, with 18 months of active construction activity. <br /> SECTION V - COMPENSATION <br /> The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered pursuant to this <br /> Agreement fees in accordance with the following : <br /> A. Professional Services Fee <br /> The ENGINEER will bill the COUNTY monthly on a percentage complete/lump sum basis <br /> according to the following schedule of values : <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.