Laserfiche WebLink
to accommodate the mast arm foundations . Mast arm foundations shall be located to <br /> avoid conflict with existing and/or proposed utilities and drainage features . No changes <br /> are proposed for the proposed span wire signals to be located at 8"' Street, 12`h Street and <br /> 16`h Street intersections with 43`d Avenue . The COUNTY shall adopt all of the previous <br /> design drawings prepared by sub-consultants William, Hatfield & Stoner. The County <br /> Traffic Engineer, Chris Mora, will sign and seal all adopted drawings, as necessary. <br /> 11 . Landscaping — ENGINEER will revise landscape construction drawings to reflect <br /> proposed changes as directed by the COUNTY. The COUNTY shall provide a "red- <br /> lined" mark-up of proposed changes to the existing landscape plans . <br /> 12 . Maintenance of Traffic — The COUNTY shall provide a "redlined" marked-up set of <br /> plans to show work zones, detours, and permitted traffic lane closures . The ENGINEER <br /> shall prepare construction phasing plans based on the COUNTY marked-up plans to <br /> provide a uniform basis for bidding. Plans and notes will be based on FDOT standard <br /> traffic control indices , typical sections and notes . Detailed plans indicating locations of <br /> work zone devices, striping and signing will not be provided, such detailed plans will be <br /> required from the CONTRACTOR. <br /> 13 . Utility Coordination — ENGINEER will coordinate "pot-holing" of existing water and <br /> sewer utilities at revised locations of storm sewer/utility crossings and other potential <br /> utility conflict locations . The Indian River County Road and Bridge Department will <br /> provide all excavation work for the purpose of exposing existing utilities . ENGINEER <br /> will coordinate with the Indian River County and City of Vero Beach Utility Departments <br /> to have their respective utilities located prior to excavation. ENGINEER will survey and <br /> obtain horizontal and vertical locations of water and sewer utilities at the "pot-holed" <br /> sites . ENGINEER will identify utility conflicts and identify where utility adjustments will <br /> be required. <br /> ENGINEER will prepare and submit separate highlighted plan/profile sets of drawings to <br /> IRC Utilities , City of Vero Beach Utilities, Bell South, FP&L, City Gas and local cable <br /> company highlighting the individual ' s utilities for their use in planning utility relocations <br /> and/or conflict resolution. Redesign and plan preparation of relocation of existing utilities <br /> will be the responsibility of the individual utility, except where already included in the <br /> existing design. <br /> 7 <br />