My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-261
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-261
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2016 11:13:56 AM
Creation date
9/30/2015 6:57:26 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/23/2003
Control Number
2003-261
Agenda Item Number
14.B.1
Entity Name
Carter Associates
Subject
Work Order No.4 Services IRC Landfill Topographic
Area
Landfill
Project Number
C.A.I. 03-544F
Archived Roll/Disk#
3208
Supplemental fields
SmeadsoftID
3445
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vertical data (elevations) shall be established using conventional third order <br /> accuracy standards and shall be relative to the National Geodetic Vertical Datum <br /> of 1929 . <br /> The topographic data as established using aerial photography acquired on May 30th, 2003 <br /> will have the following accuracy standards . <br /> Well identified horizontal features - ± 1 . 25 ' <br /> Spot elevations and well identified vertical features - ± 0 . 25 ' <br /> Contours - ± 0 . 5 ' <br /> SURVEYOR will "ground truth ' existing natural topographic features to ensure <br /> accuracy of topographic map prepared by aerial photogrammitrist . <br /> B . SURVEYOR' S WORK PRODUCT <br /> SURVEYOR shall provide the following : <br /> • Four Copies (24" x 36" Bond) of topographic survey with as-built drainage <br /> structures and associated as -built information. <br /> • Topographic/as-built survey in AUTOCAD 2000 format <br /> • Report of topographic survey prepared by aerial photogrammitrist . <br /> WORK ORDER NOAmTIME FOR COMPLETION <br /> The work Order No . 4 shall be completed within 8 weeks from the Notice to Proceed . <br /> WORK ORDER NO , 4m COMPENSATION <br /> The COUNTY agrees to pay, and the SURVEYOR agrees to accept, a fee for <br /> services rendered according to the "Scope of Services Provided by the SURVEYOR," <br /> identified in Section III of this WORK ORDER NO . 4, with a lump sum fee under this <br /> WORK ORDER of 9 840 . 00 . See proposal attached. <br /> [REMAINDER OF THIS PAGE LEFT BLANK INTENTIONALLY] <br />
The URL can be used to link to this page
Your browser does not support the video tag.