My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-038
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2016 3:36:43 PM
Creation date
9/30/2015 6:21:53 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/11/2003
Control Number
2003-038
Agenda Item Number
11.G.1.
Entity Name
Carter Associates, Inc.
Subject
Installation of tilting Weir Gates-Work Order No.2
Archived Roll/Disk#
3160
Supplemental fields
SmeadsoftID
3160
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IMPLEMENTATION OF THE <br /> EAST INDIAN RIVER COUNTY MASTER STORMWATER <br /> MANAGEMENT PLAN . <br /> WORK ORDER No . 2 <br /> TO THE <br /> PROFESSIONAL ENGINEERING SERVICES AGREEMENT <br /> BETWEEN CARTER ASSOCIATES, INC. AND <br /> INDIAN RIVER COUNTY, FLORIDA <br /> FOR THE <br /> INSTALLATION OF TILTING WEIR GATES <br /> Pursuant to the Professional Engineering Services Agreement (MASTER AGREEMENT) <br /> dated May 8 , 2001 , by and between INDIAN RIVER COUNTY, a political subdivision of the <br /> State of Florida, hereinafter referred to as the COUNTY, and CARTER ASSOCIATES , INC . , <br /> Vero Beach, Florida, hereinafter referred to as the ENGINEER, this WORK ORDER No . 2 is an <br /> extension of and hereby becomes a part of the MASTER AGREEMENT as follows : <br /> SECTION I - PROJECT LIMITS AND DESCRIPTION <br /> In accordance with the East Indian River County Master Stormwater Management Plan ' s <br /> (Master Plan) recommended improvements and actions , WORK ORDER NO . 2 includes the <br /> following major components , which are discussed in more detail in SECTION III — SCOPE OF <br /> SERVICES PROVIDED BY THE ENGINEER : Retrofit the existing spillover gate of each of the <br /> Indian River Farms Water Control District ' s (IRFWCD) four existing radial arm control <br /> structures with a tilting weir gate (overshoot gate) . The four existing radial arm control <br /> structures are located in the following IRFWCD canals : ( 1 ) North Relief Canal, (2) Main Relief <br /> Canal, (3 ) South Relief Canal, and (4) Lateral " C" Canal <br /> SECTION II - COUNTY OBLIGATIONS <br /> The COUNTY will coordinate with the IRFWCD and review and comment on the ENGINEER ' s <br /> work in a timely fashion. <br /> SECTION III - SCOPE OF SERVICES PROVIDED BY THE ENGINEER <br /> A. The ENGINEER shall provide the following services so that the Work described in <br /> Section I — "Project Limits and Description, " can be permitted by applicable regulatory <br /> agencies , properly bid by IRFWCD , and constructed by a Contractor selected by <br /> IRFWCD : <br /> 1 . Engineering Design Services and Surveying Services <br /> 2 , Construction Drawings <br /> F :\Public Works\KeithM\Stormwater Projects\East IRC\Contracts\Cmsultant Contract with Carter & Associates\Wcrk Order No. 2 - Replacement <br /> of Radial Arm Gates\Work Order No. 2 - Latest Revision .doc I <br /> EAST INDIAN RIVER COUNTY MASTER STORMWATER MANAGEMENT PLAN <br />
The URL can be used to link to this page
Your browser does not support the video tag.