My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-335
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-335
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 1:22:41 PM
Creation date
10/1/2015 12:43:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/14/2008
Control Number
2008-335
Agenda Item Number
8.I.
Entity Name
Carter Associates
Subject
Work Order No. 14 High Water Mark Survey
Tropical Storm Fay
Area
12th St. -82nd. Ave.
Project Number
0846
Supplemental fields
SmeadsoftID
7647
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Carter <br />IRC Work Order 14 <br />IRC High Water Mark Survey <br />October 14th, 2008 <br />Page 2 of 3 <br />4. Prepare deliverables, including organizing pictures, field notes, ASCII file and <br />Surveyor's report. <br />SECTION 111— TIME FOR COMPLETION & DELIVERABLES/WORK PRODUCT <br />1. Project shall be completed as follows: <br />a) Project completed 30 days from Notice to Proceed, on an as needed basis. <br />2. Deliverables -The SURVEYOR shall provide the COUNTY: <br />b) An ASCII file containing the northing, easting, elevation and description of the <br />points collected. <br />c) A signed and sealed Surveyor's Report documenting the methods of data <br />collection, time of survey and other items as determined by the County or the <br />Surveyor along with a CD containing pictures and ASCII File. <br />d) Work Product and digital versions are to prepared and submitted so that the <br />COUNTY or other consultants can readily use it for the design and analysis of <br />the area, as defined. It shall contain all information necessary for third -party <br />surveyor to independently recreate and/or utilize the survey work. It is <br />acknowledged all final products become property of Indian River COUNTY <br />and will be available for use by the public at large. <br />e) The SURVEYOR'S work product shall meet or exceed the minimum <br />standards as defined by Sections II, III and IV or the COUNTY will not <br />approve the SURVEYOR'S request for payment. <br />SECTION IV — COMPENSATION <br />The COUNTY agrees to pay, and the SURVEYOR agrees to accept, for the above described <br />services rendered as identified in Sections I, II, and III of this Work Order No. 14, for a total lump <br />sum fee of $4,960.00. <br />All and/or any additional services not described hereon shall be pre -approved by the <br />COUNTY. Approved additional services shall be invoiced at the rates disclosed in the <br />approved fee schedule with the SURVEYOR for the contract year(s) of November 61h, 2007 <br />through November 5th, 2009. <br />All invoicing shall include project identification, Work Order No. (WO 14), Contract Number <br />0725, itemize man-hours and materials expended to complete the scope of services. Payments <br />shall be in accordance with the original Professional Surveying and Mapping/GIS Services <br />Agreement, contract No: 0725 with the COUNTY and as stated in Section II, III and IV hereon. <br />Remainder of page left blank intentionally <br />
The URL can be used to link to this page
Your browser does not support the video tag.