My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-269
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-269
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2016 2:10:36 PM
Creation date
10/1/2015 12:32:15 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/09/2008
Control Number
2008-269
Agenda Item Number
8.I.
Entity Name
Carter Associates
Subject
Supplemental No.2 to Work Order No.1
Indian River County Parks Maintenance Complex
Area
Parks Maintenance Complex
Supplemental fields
SmeadsoftID
7547
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c� c <br /> r ' <br /> • <br /> Board of County Commissioners <br /> 1801 27th Street <br /> Vero Beach, Florida 32960 <br /> Telephone : (772) 5674000 <br /> FAX : 772-778-9391 <br /> INDIAN RIVER COUNTY PARKS MAINTENANCE COMPLEX <br /> SUPPLEMENTAL No . 2 to WORK ORDER NO . 1 <br /> TO THE <br /> PROFESSIONAL CIVIL ENGINEERING SERVICES AGREEMENT <br /> WITH <br /> CARTER ASSOCIATES , INC . <br /> This Supplemental No . 2 to Work Order No . 1 is in accordance with the existing <br /> AGREEMENT dated January 9 , 2007 and the extension thereof, between Carter <br /> Associates , Inc . (ENGINEER) and Indian River County ( COUNTY) . <br /> This Supplemental No . 2 to Work Order No . 1 amends the agreement as follows : <br /> SECTION I — PROJECT LIMITS <br /> Consultant services are required for the re-design of the stormwater management system <br /> and the potable water service connection for the construction of the Indian River County <br /> Parks Maintenance Complex . <br /> SECTION II — SCOPE OF SERVICES <br /> The Scope of Services for this Supplemental No . 2 to Work Order No . 1 is to perform the <br /> following tasks as requested by the County: <br /> Stormwater Management System to include : <br /> • Revise the Paving, Grading and Drainage Plan to call out revised stormwater pond <br /> control structure weir elevations and show revised permanent pool contours . <br /> • Revise the control structure detail . <br /> • Revise and update the stormwater calculations report . <br /> • Submit revised plans and calculations to the SJRWMD and IRC Engineering Dept . <br /> C :\Documents and Settings\SeanM\Local Settings\Temporary Internet Files\OLK I \0701 Supplemental No 2 to WO No l Carter 08- <br /> 21 -08.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.