My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-112
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2016 11:51:09 AM
Creation date
9/30/2015 7:34:18 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/11/2004
Control Number
2004-112
Agenda Item Number
11.I.2
Entity Name
Carter Associates
Subject
Work Order No.5
Final design services Stormwater Pollution Control System
Area
Main Relief, South Relief, and North Relief Canal
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3770
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
53 ICDS vortex Solids Removal Design - North Relief Canal CDS Show mechanical details of the CDS treatment unit automated solids removal <br />facilities <br /> 54 CDS Treatment System Details - Main Relief Canal CDS/ECT/CAI Show details of all mechanical, structural and other connections between the <br />CDS units and the site facilities <br /> 55 CDS Treatment S tem Details - South Relief Canal CDS/ECT/CAI Stow details of all mechanical, structural and other connections between <br />the CDS units and the site facilities <br /> 56 CDS Treatment System Details - North Relief Canal CDS/ECT/CAI Slow details of all mechanical, structural and other connections between the <br />CDS units and the site facilities <br /> 57 Weigh Scale Station Details - All Sites ECT Stow details of the weigh scale Installation <br /> 58 Bank Stabilization Plan and Details - Main Relief Canal ECT Show a plan view, profile views and details of the Main Relieve Canal bank <br />stabilization (outside the influence of the lilting weir. <br /> 59 Bank Stabilization Plan and Details - South Relief Canal ECT Stow plan and details of the bank stabilization (outside the influence <br />of the filling weir. <br /> 60 Bank Stabilization Plan and Details - North Relief Canal ECT Show plan and details of the bank stabilization (outside the influence <br />of the filling weir. <br /> 61 Weir Gate Foundation Structural Plans/Details - Main Relief Canal STIR Structural sections and details <br /> 62 Weir Gate Foundation Structural Plans/Details - South Relief Canal STR Strw.iural sections and details <br /> 63 Weir Gate Foundation Structural Plans/Details - North Relief Canal STR Structural sections and details <br /> 64 Weir Gate Bays and Sill Structural Plans/Details - Mali Relief Canal STR Structural sections and details <br /> 65 Weir Gate Bays and Sill Structural Plans/Details - South Relief Canal STR Structural sections and details <br /> 66 Weir Gate Bays and Sill Structural Plans/Details - North Relief Canal STR Structural sections and details <br /> 67 Inial and Outlet Channel Structural Plan and Profile - Main Relief Canal STR Structural plan and profile views <br /> 68 Inlet and Outlet Channel Structural Plan and Profile - South Relief Canal STR Structural plan and profile views <br /> 69 Inlet and Outlet Channel Structural Plan and Profile - North Relief Canal STR Structural plan and profile views <br /> 70 Inlet and Outlet Channel Structural Details - All Sites STR Structural details at edges, comers connections, etc. <br /> 71 CDS Treatment Unit Shictxal Plan and Profile - Main Relief Canal STR Structural plan and profile views <br /> 72 CDS TreaMent Unit Structural Plan and Profile - Main Relief Canal STR Strucheal plan and profile views <br /> 73 CDS Treatment Unit Structural Details - Main Relief Canal STR S7uct ural sections and details <br /> 74 CDS Treatment Unit Structural Plan and Profile - South Relief Canal STR Structural plan and profile views <br /> 75 CDS Treatment Unit Structural Details - South Relief Canal STR Structural sections and details <br /> 76 CDS Treatment Unit Structural Plan and Profile - North Relief Canal STR Structural plan and profile views <br /> 77 CDS Treatment Unit Structural Details - North Relief Canal STR Stnrctrral sectors and details <br /> 78 Weigh Scale Structural - All Sites STR Structural weigh scale foundation plan and details for typical site <br /> 79 General Structural Details and Notes - All Sites STR Structural details and notes common to the overall structural design (bends, <br />overlaps, notes, etc.) <br /> 80 Flow Meter, Safety and Wash down Equipment Details - AN Sites ECT IShow details of the flow meters, safety equipment and cleaning equlpmenL <br /> 81 Miscellaneous General Details CDS/ECT/CAI lProMde any general details necessary to support the engineering provided on other design <br />sfheets. <br /> Note: This is a preliminary list for Identifying team member responsibilities. The actual sheets may ultimately combine some drawings, while some drawings may require <br />additional sheets. <br /> Attachment 1 to Work Order fl5.xis <br />
The URL can be used to link to this page
Your browser does not support the video tag.