My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-088
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 11:58:22 AM
Creation date
10/1/2015 12:02:01 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/18/2008
Control Number
2008-088
Agenda Item Number
7.J.
Entity Name
Carter Associates
Subject
Oslo Road and boat ramp facility Phase 1 and 2
Area
Oslo Road Boat Ramp
Project Number
0725
Supplemental fields
SmeadsoftID
6935
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 5 <br />Oslo Boat Ramp WO 8 Carter <br />Additional Services <br />3-18-08 <br />5. Calculate and depict the location of the County owned lands (Parcel ID # <br />33401900000700000002.0) lying north of Oslo Road and adjacent to the Indian River <br />Lagoon by deed to be provided by the County. <br />6. Establish and delineate the approximate location of the northern most riparian line of the <br />calculated County owned lands <br />7. Perform Topographic/Hydrographic survey of the proposed ramp and dock facility area. <br />Project area is approximately 100 feet easterly of the existing shoreline from 50 feet <br />south of the south right-of-way of Oslo Road to 50 feet north of the County owned lands. <br />Topography to include a 25 foot grid, cross sections of the existing shoreline and cross <br />sections of the existing channel, if any. <br />8. Contact DEP to establish the current elevation of the MHW pursuant to Chapter 177, <br />Part II Florida Statues. Delineate the MHWL location on the updated survey and submit <br />to DEP for approval. <br />9. Project management, onsite meetings and coordination with G.K. Environmental, I.R.C., <br />S.J.R.W.M.D. and D.E.P. <br />SECTION III — TIME FOR COMPLETION & DELIVERABLES/WORK PRODUCT <br />1. Project shall be completed within thirty (30) business days from Notice to Proceed. <br />2. Deliverables SHALL BE CERTIFIED TO Indian River County and shall include five (5) <br />signed and sealed 24" x 36" surveys (in state Plane Geometry), electronic copies in <br />AutoCAD 2007 and PDF formats. <br />SECTION IV — COMPENSATION <br />The COUNTY agrees <br />to pay, <br />and <br />the <br />SURVEYOR agrees <br />to accept, <br />for <br />services rendered as <br />identified in Sections I, <br />II, and <br />III of <br />this <br />Work Order No. 8, a <br />lump sum <br />fee <br />of $ 10,960.00. <br />Remainder of page left blank intentionally <br />J:\SURVEY WORK AUTHORIZATIONS\IRC Survey 2007-2009\0725 WO 8 Carter Olso Boat Ramp Additional Services 3-18- <br />08.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.