My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-399B
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-399B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 3:40:22 PM
Creation date
9/30/2015 10:18:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Cash Deposit and Escrow Agreement
Approved Date
11/16/2006
Control Number
2006-399B
Agenda Item Number
Administrators Signature
Entity Name
Certex/Lennar at Woodfield, LLC
Subject
Maintenance bond for Woodfield PD, Phase 3
Supplemental fields
SmeadsoftID
5961
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KU=44ORN AND A8110=7E6, INC. tp12y2ppp <br /> eo1 reaTaeET, au7Eaao Woodfield at Vero Beach <br /> VEI10 SEACIL FLONNA E2YED <br /> (7r2) a nvIsal NNAJ06 NO. W71S <br /> Opinion of Probable Construction Cost - Phase 3 (lots 77 • 181 ) <br /> SITEWORK Quanthy Una Unit Cost Tow <br /> Storm Drainage <br /> Iran 1,o60 LF. $15.00 $15,200.00 <br /> 7reD 3,576 LF. $20.50 $73,308.00 <br /> 86• SD 648 LF. $46.00 $29,854.00 <br /> 4r so 400 LF. $67.50 $27,000.00 <br /> ar so 110 LF. $65.00 $8,350.00 <br /> arawall. 2 EA $40000.00 $5,000.00 <br /> GuBar Nlab 29 EA. $21000.00 $58,000.00 <br /> Ty" C Inlet 7 EA $21000.00 $14,000.00 <br /> moon Manwe 7 EA. $11635.00 $12,845.00 <br /> 43• Mirmw am Bacon i EA. $2,020.00 $2,020.00 <br /> 36• Mibwd End section 1 EA $11900.011 $11900.00 <br /> Dwmpe Central Btrunbw wl skimm r 1 EA $3,100.00 $3100.00 <br /> sulsbbl $255,577.00 <br /> PAVING <br /> ON 8rrE PAVING Quandly Unit Una Coat <br /> Aaphtltll 'J-i 61500 S.Y. $7.00 $59,500.00 <br /> Sault Cmlulnal 6,500 S.Y. $1150 $97,750.00 <br /> BbenWaBabprWe (6• tlNrk7 10,825 S.Y. $2.00 $21 ,250.00 <br /> Ty Fmrb 150 L.F. $6.50 $1 ,275.00 <br /> 141=1 Caseate Curb 6,000 LF. $6.50 $65,000.00 <br /> sub tzl $247,775.00 <br /> PHASE 3 TOTAL $583,35290 <br /> MAINTENANCE BOND AMOUNT FOR PHASE 3 (2WYs) $125,638.00 <br /> 1, James G. Vfber, II, a Florida Registered Engineer, Umnse No. 58536, do hereby oertffy to Indian River County that a cost estimate has been prepared under m <br /> responsible direction for those Improvements 9emaed In this exhibit and that the total cost estimated for mid Improvements is 5513,352. This estimate <br /> has been prepam, in pert, to induce approval by the County of a CaRMoate of Completion for Woodfield at Vero Beach, Phase 3, and ior the purpoas of <br /> establishing proper surety amowps therewith. <br /> r r?S36 <br /> G. VIBer, 11, P.E. - /0 FL FL Reg. No. <br /> EXHILBI I " A " <br /> Page 2 of 2 <br /> G:16715pODblENGCOST E5RWordpeN Lbbbvn® erxvl (N Phuee}xN <br />
The URL can be used to link to this page
Your browser does not support the video tag.