Laserfiche WebLink
EXHIBIT 'N <br /> 136th Place <br /> Roadway and Stormwater <br /> DESCRIPTION QUANTITY UNIT UNIT PRICE QTY PRICE <br /> 6" Stabilized Shoulder 1 196 SY $ 2. 10 $ 21511 .60 <br /> 12" Stabalized Su rade 3 052 SY $ 2.65 $ 8,087.80 <br /> 8" Rock Base 2 962 SY $ 6.25 $ 16,512.50 <br /> As halt 1trt" S-1 21877 SY $ 5.75 $ 16, 542.75 <br /> Stri in & Signs 1 LS $ 51936.00 $ 5,936.00 <br /> Control Structure 1 EA $ 2,800. 00 $ 22800.00 <br /> 19 x 30 ERCP 85 LF $ 68.00 $ 51780.00 <br /> 18" RCP 80 LF $ 31 .00 $ 2t480.00 <br /> 19 MO MES 2 LF $ 675.00 $ 1 ,350.00 <br /> 18" MES 3 EA $ 575.00 $ 1 ,725.00 <br /> Construction Cost 659725.65 <br /> Maintenance Bond Q 25% S 16,431 .41 <br /> PREPARED BY MASTELLER & MOLER, INC. <br /> 5Golo <br /> Earl H. Masteller, PT=. , D E #26658 <br /> President <br /> vw.z�c..u .vue —> arcu.9 .L_ _.1 <br /> Page 3 of 3 <br /> (Bond ExW kOM 006ads) 1 Of 1 <br />