Laserfiche WebLink
EXHIBIT 'A' <br /> 136th Place <br /> Roadway and Stormwater <br /> DESCRIPTION QUANTITY UNIT UNIT PRICE QTY PRICE <br /> 6" Stabilized Shoulder 1 196 $EA <br /> $ 2. 10 $ 21511 .60 <br /> 12" Stabalized Sub rade 31052 $ 2.65 $ 81087.80 <br /> S" Rods Base 2 962 $ 6.25 $ 18 512.50 <br /> Asphalt 1 i2" S-1 21877 $ 5.75 $ 16 542.75 <br /> Striping & Signs 1 $ 51936.00 $ 593600 <br /> Control Structure 1 $ 2,800.00 $ 2 800.00 <br /> 19 x 30 ERCP 85 $ 68.00 $ 51780.00 <br /> 18" RCP 80 LF $ 31 .00 $ 21480.00 <br /> 19x30 MES 2 LF $ 675.00 $ <br /> 11350.001 <br /> 18" MES 3 EA $ 575.00 $ 11725.00 <br /> Construction Cost S 85,723.65 <br /> Maintenance Bond 25% $ 16,431 .41 <br /> PREPARED BY MASTPLLER & MOLER, INC. <br /> L <br /> Earl H. Masteller, PI. , D _EOMM8 <br /> President <br /> S. I I " iv <br /> 4 � <br /> Page 3 of 3 <br /> (Bond Exhlbft 061006xis) 1 of 1 <br />