Laserfiche WebLink
7 �C 7 <br /> x_200 7 . � 5 `t <br /> t - i <br /> AIA Document G704TM — 2000 j _ a1 <br /> Certificate of Substantial Completion <br /> PROJECT: PROJECT NUMBER: 5054. 181 OWNER: ❑ <br /> (Name and address): CONTRACT FOR: General Construction ARCHITECT: ❑ <br /> IRC Emergency Operations Center CONTRACT DATE: June 6, 2006 CONTRACTOR: ❑ <br /> 4225 43' Avenue <br /> Vero Beach, Florida 32967 FIELD: ❑ <br /> TO OWNER: TO CONTRACTOR: OTHER: ❑ <br /> (Name and address): (Name and address): <br /> Indian River County Tamer Construction, Co. <br /> 184025th Street 800 N. Magnolia Avenue, Suite 500 <br /> Vero Beach, Florida 32960 Orlando, Florida 32803 <br /> PROJECT OR PORTION OF THE PROJECT DESIGNATED FOR PARTIAL OCCUPANCY OR USE SHALL INCLUDE: <br /> Complete Building Facility as Permitted and Site Plan Approved. <br /> The Work performed under this Contract has been reviewed and found to the Architect's best knowledge, information and belief, <br /> to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated <br /> portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for <br /> its intended use. The date of Substantial Completion of the Project or portion designated above is the date of issuance established <br /> by this Certificate, which is also the date of commencement of applicable warranties required by the Contract Documents, except <br /> as stated below: <br /> Warranty Date of Commencement <br /> Complete Project Z407/23/07 <br /> Donadio & Associates, /23/07 <br /> Architects, P.A. <br /> ARCHITECT DATE OF ISSUANCE <br /> A list of items to be completed or corrected is attached hereto. The failure to include any items on such list does not alter the <br /> responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Unless otherwise agreed to in <br /> writing, the date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate <br /> of Payment or the date of final payment. <br /> Cost estimate of Work that is incomplete or defective: $10,000.00 <br /> The Contractor will complete or correct the Work on the list of items attached hereto within Fourteen ( 14 ) days from the above <br /> date of Substantial Completion. / <br /> Turner Construction, Co. <br /> CONTRACTOR DATE <br /> The Owner accepts the Work or designated portio ally complete and will assume full possession at 8:o0A.M . (time) <br /> on 0724107 (date). <br /> Indian River County J e <br /> OWNER BY Jos ph A . Baird DATE <br /> Cou ty Administrator / As au horiz d pursuant to Resolution <br /> The responsibilities of the Owner and ntractor for security, maintenance, heat, utilities, darryt e to the Work and insurance # 2007 -075 <br /> shall be as follows: <br /> (Note: Owner 's and Contractor's legal and insurance counsel should determine and review insurance requirements and <br /> coverage.) <br /> Contractor shall be responsible for Security, Maintenance, Heat, Utility, Damage to Work & Insurance until a Certificate of <br /> Occupancy is obtained. <br /> AIA Document G704w - 2000. Copyright m 1963, 1978, 1992 and 2000 by The American Institute of Architects. All rights reserved. WARNING: This AIA° <br /> Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any 1 <br /> portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document <br /> was produced by AIA software at 08:16:37 on 07/25/2007 under Order No.1000270401 _1 which expires on 11/1612007, and is not for resale. (743569217) <br /> User Notes: <br />