My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-295
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-295
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2016 11:02:26 AM
Creation date
9/30/2015 11:07:05 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
09/04/2007
Control Number
2007-295
Agenda Item Number
14.A.6
Entity Name
Barth Construction,Inc.
Subject
Change Order No. 1 Fire Station #12
Area
Fire Station #12
Supplemental fields
SmeadsoftID
6540
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER Distribution to : <br /> AIA DOCUMENT G701 OWNER _ <br /> ARCHITECT 7 ' <br /> CONTRACTOR _ <br /> FIELD _ <br /> OTHER <br /> PROJECT: CHANGE ORDER NUMBER: I <br /> I . R.C. Fire Station 412 <br /> 5'h Street SW <br /> Vero Beach, FL 32968 <br /> INITIATION DATE : <br /> TO (Contractor): <br /> 1— —I ARCHITECT' S PROJECT NO : <br /> Barth Construction, Inc. <br /> 1717 Indian River Blvd. CONTRACT FOR: <br /> Suite 202A <br /> L Vero Beach, FL 32960 J CONTRACT DATE: <br /> You are directed to make the following changes in this Contract: <br /> This Change Order will adjust the contract to match the final cost of the project. <br /> Final Cost of Part 1 $4903 .93 <br /> Less Current Contract Amount <$ 105 ,501 .00> <br /> Change Order Amount <$555617.07> <br /> Not valid until signed by both the Architect and Owner. <br /> Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time <br /> The Original (Contract Sum) was . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 105 ,501 .00 <br /> Net change by previously authorized Change Orders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 0. 00 <br /> The (Contract Sum) (Guaranteed Nr,._• :.., um Gess) prior to this Change Order was . . . . . . . . . . . . $ 105 , 501 .00 <br /> The (Contract Sum) (r,. . .._..nteed MwEin- • •m Cost) will be (increased) (decreased) (un <br /> by this Change Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . -$ 55 ,617 . 07 <br /> The new (Contract Sum) including this Change Order will be $ 49, 883 .93 <br /> The Contract Time will be ( ine_.... ..ed) ( ,..,._.,ased` (unchanged) by ( ) Days <br /> The Date of Substantial Completion as of the date of this Change Order therefore is <br /> ARCHITECT CONTRACTOR OWNER <br /> Edlund, Dritenbas, Hinkley, Arch . Barth Construction Indian River County Dept. of Emer. <br /> 65 Royal Palm Pointe, SuiteD 1717 Indian River Blvd. 1840 25' ' StreeC <br /> Vero Beach, FL 32960 Suite 202A Vero Beach, FL 32960 <br /> Vero Beach, FL 32960 <br /> BY: BY : BY : . <br /> DATE: DATE : °7 DATE: <br /> AIA DOCUMENT G701 ` CHANGE ORDER ' APRIL 1978 EDITION ' AIA • 1978 <br /> THE AMERICAN INS TOTE OF ARCHITECTS, 1735 NEW YORK AVE.. N.W., WASHINGTON, D.C. 20006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.