.Roadway Improvement Plans for Indian River County Administration Building77N ''''
<br /> s ; 4;hange Order No. 1 GR I' G N h L
<br /> qOb & - l7 `1
<br /> INDIAN RIVER COUNTY, FLORIDA
<br /> CHANGE ORDER NO. 1
<br /> PROJECT NO: ENGINEERS PROJECT NUMBER 64T60600D PROJECT: ROADNAY IMPROVEMENT PLANS FOR INDIAN
<br /> RIVER COUNTY ADMINSTRATION BUILDING
<br /> CONTRACTOR: CONE AND GRAHAM DATE OF ISSUANCE
<br /> ECI.
<br /> QTY REVISED
<br /> REDUCTION QTY
<br /> UNIT COST BID COST ADJUSTED COST
<br /> Roadway COST REDUCTION
<br /> MOBILIZATION 15% 0 1 .0 148,600.00 $148,600.00 $148,600.00 $000
<br /> MAINTENANCE OF TRAFFIC 8% 0 1 .0 30,000.00 $30,000.00 $30000,00 $000
<br /> PREVENTION, CONTROL, 8 ABATEMENT 0 1 .0 10,000.00 $10,000.00 $10,000.00 $0.00
<br /> OF EROSION 8 WATER POLLUTION O.0
<br /> CLEARING & GRUBBING 0.0 1.0 50,000.00 $50,000,00 $48,000.00 $2,000.00
<br /> EMBANKMENT 90 478.0 36.00 $20,376.00 $17, 136.00 $3,240.00
<br /> TYPE B STABILIZATION SY 2330 535 1795.0 7.50 $17,475.00 $13,462.50 $4,012.50
<br /> OPTIONAL BASE GROUP ? SY 2099 471 1628.0 17.00 $35,683.00 $27,676.00 $8,007.00
<br /> TURNOUT CONSTRUCTION SV 40 0 40.0 175.00 $7,000.00 $7,000.00 $0,00
<br /> TYPE S ASPHALTIC CONCRETE (21/2" SY 2099 2099 0.0 18.00 $37,782.00 $0.00 $0.00
<br /> TYPE S ASPHALTIC CONCRETE (1112") SY 0 0 1789.0 13.50 $0.00 $24,151.50 $13,630.50
<br /> MISCELLANEOUS ASPHALT PVT 008/S IN 10 0 10.4 205.00 $2, 132.00 $2132.00 $0.00
<br /> INLET CURB TYPE P EA 2 0 2.0 5,500.00 $11 ,000.00 $11 ,000.00 $0.00
<br /> TYPE P-8 MANHOLE EA 1 0 1 .0 2,300-00 ___12,300.001 $2,300.00 $000
<br /> TYPE J-7 MANHOLE EA 1 0 1 .0 13,000.00 $13000.00 $13,000.00 $0.00
<br /> ADJUSTMANHOLE EA 1 1 0.0 1,210.00 $1,210.00 $1,210.00 $0.00
<br /> ADJUST VALVE BOXES EA 4 4 0.0 1,000.00 $4,000001 $0.00 $4000.00
<br /> CONC PIPE CULVERT 18" STORM DRAIN LF 236 0 236.0 50.00 $11 ,800,00 -$11 .800.65 $000
<br /> ELLIPT CONIC PIPE CULV 14'X23' SIDE DRN LF 64 0 64.0 60.00 $3840.00 $3840.00 $0,00
<br /> ELLIPT CONIC PIPE CULV 19'X30" SIDE DRN LF 1 118 0 118.0 91 .00 $10,738.00 $10,738.00 $0.00
<br /> MITERED END SECTION 14"X23" SIDE DRN EA 1 0 1 .0 1 ,800.00 $1 ,800.00 $1 ,800.00 $0.00
<br /> MITERED END SECTION 19"X30- SIDE DRN EA 2 0 2.0 1 800.00 $3,600.00 $3.600.00 $0.00
<br /> TYPE F CURB & GUTTER LF 1 676 223 453.0 21.00 $14,196.00 $9,513.00 $4,683.00
<br /> 4" CONCRETE SIDEWALK SY 468 149 319.0 35.00 $16,360.00 $11116500 $5,21500
<br /> GUARDRAIL (ROADWAY) LF 1 2500 250.0 45.00 $11 ,250.00 411 ,250.00 $0.00
<br /> GUARDRAIL END ANCHORAGE ASSY EA 4 0 4.0 500.00 $2,000,00 $2 000.00 $0,00
<br /> SOD BAHIA SY 1200 486 714.0 6.00 $7,200.00 $4,284.00 $2,916.00
<br /> SIGN SINGLE-POST E41 4 0 4.O 350.00 $1400.00 $1400.00 $0.00
<br /> SIGNMULTI-POST EA 3 0 3.0 900.00 $2, 700,00 $2700.00 $0.00
<br /> REFLECTIVE PAVEMENT MARKERS EA 75 75 0.0 7.00 $525.00 $0.00 $52500
<br /> DIRARROW (FHERM0PLASRC) (PAINT) EA 4 0 4.0 55.75 $280.00 $223.00 $57.00
<br /> 6" WHITE SKIP("WJ?M0PLASTW4(PAINT) LF 171 1 O 171.0 0.75 $171.00 $128.25 $42.75
<br /> 6" WHITE {TNERAIAPb1SACa (PAINT) LF 1530 223 1307.0 0.75 $1,530.00 $980.25 $549.75
<br /> 18" WHITE (TRERMOPf ASTIC) (PAINT) LF 170 1 0 170.0 Z60 $595.00 -.00 -$l
<br /> 24" WHITE (FNERMOPUISFIC) (PAIN?) LF 39 0 39.0 3. 71 $195.00 $144.69 $6031
<br /> 6" YELL0W (FNERM0P4AST7C}(PAIN] LF 1452 222 1230.0 0.81 $1,597.20 $996.30 $600.90
<br /> 18" YELLOW (FFIE4M9RLP,ST4E)-(PAINT) EA 41 0 41 .0 2.59 $143.50 $106.19 $37.31
<br /> 4" PVC SCHEDULE 80 LF 360 0 360.0 10-001 $3,600.001 $3,500.00 $0.00
<br /> SUBTOTAL W6,098.701 6,378.68 ,720.02
<br /> Bridge
<br /> CONCRETE CLASS it APPROACH SLAB CY 124.4 0 124.4 600.00 $7q 640.00 $74,640.00 $0.00
<br /> CONCRETE CLASS II SUPERSTRUCTURE CY 343 0 343.0 800.00 $274400.00 $274400.00 $0.00
<br /> CONCRETE CLASS IV SUBSTRUCTURE CY 129 0 129.0 800.00 $103200.00 $103,200.00 $0,00
<br /> CONCRETE CLASS IV MISCELLANEOUS CY 42.5 0 42.5 600.00 $25,500.00 $25,500.00 $0.00
<br /> BRIDGE FLOOR GROOVING SY 569 0 56.9.0 5.00 $2,845.00 $2,845.00 $0.00
<br /> REINFORCING STEEL SUPERSTRUCTURE LB 99992 0 99992.0 1 .30 $129,989.60 $129,989.60 $0.00
<br /> REINFORCING STEEL SUBSTRUCTURE LB 15284 0 15284.0 1 .30 $19,869.20 $19,869.20 $0.00
<br /> REINFORCING STEEL APPROACH SLAB LB 23374 0 23374.0 1 .30 $30,386.20 $30,386.20 $0.00
<br /> REINFORCING STEEL (MISCELLANEOUS) LB 18160 1816.0 1 .30 $2360.80 $2,360.80 $0.00
<br /> PRESTRESSED CONIC PILING 18" SQ LF2956 0 2956.0 50.00 $147,800.00 $143,950.00 $3,850.00
<br /> TEST PILES PRESTRESSED C0NCx11r SQ LF 316 0 316.0 200.00 $63,200.00 $67,200.00 $4,000.00
<br /> CONC TRAFFIC BARRIER BRIDGE 42" LF 248 10 248.0 110.00 $27,280.00 $27,280.00 $0.00
<br /> RIP-RAP RUBBLE TN 1670 0 1670.0 50.00 $83,500.00 $83,500.00 $0.00
<br /> RIP-RAP RUBBLE BEDDING STONE TN 551 0 551 .0 50.00 $2guff T6= 7,550.00 $27,550.00 $0.00
<br /> $1 .012,670.80 TWE
<br /> oun a time
<br /> *THERMOPLASTIC UNIT COSTS WERE REVISED TO PAINT UNIT COSTS.
<br /> Page 1 012