My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-250
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-250
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2016 2:58:46 PM
Creation date
9/30/2015 9:52:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
07/11/2006
Control Number
2006-250
Agenda Item Number
11.J.2
Entity Name
Felix Associates, LLC
Subject
74th. Ave. Force Main Loop/South of SR 60
Area
north bank of the canal on the north side of 4th street
Bid Number
2006056
Supplemental fields
SmeadsoftID
5737
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00450 <br /> CHANGE ORDER FORM <br /> CHANGE ORDER NO . 01 <br /> DATE : CONTRACTOR : Felix Assoc. LLC of 0 ,0 — aS <br /> OWNER: INDIAN RIVER COUNTY AGREEMENT DATE : May 16 2006 <br /> PROJECT NAME : 741" Ave . Force Main Loop Connection South of SR 60 Bid No 2006056 <br /> The following changes are hereby made: <br /> 1 ) Increase the Contract Amount to include <br /> Original CONTRACT PRICE $ $ 1 , 1363435. 00 <br /> Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDER $ N/A <br /> Net Increase (Decrease) Resulting from this CHANGE ORDER $ 118 . 192 .00 <br /> The current CONTRACT PRICE including this CHANGE ORDER $ 1 . 254 627 . 00 <br /> ORIGINAL CONTRACT TIME : No. Days 151 <br /> Current CONTRACT TIME adjusted by previous CHANGE ORDER No. Days N/A <br /> Net Increase (Decrease) Resulting from this CHANGE ORDER No. Days 30 <br /> Current CONTRACT TIME Including this CHANGE ORDER No. Days 181 <br /> CHANGES ORDERED : <br /> I . GENERAL <br /> This change order is necessary to increase the actual work and resulting costs performed <br /> under this Contract. <br /> It. REQUIRED CHANGES <br /> Add about 1 , 553 LF of 24" Force Main on the north bank of the canal on the north side of <br /> 4 Street. <br /> III . JUSTIFICATION <br /> The Public Works Department changed the plans for the 82nd Ave bridge over the canal <br /> on the north side of 4 1hStreet which required that a Directional Drill crossing be utilized <br /> rather than placing the force main on the bridge Unfortunately, there is not adequate <br /> right-of-way on 4 1h Street to allow construction of the Directional Drill force main under the <br /> canal and still remain within the right-of-way of 4 Street An alternative route was <br /> approved by the IRFWCD on May 11 2006 along the north bank of the canal on the <br /> north side of 41" Street from 82" Ave . west to the West Regional WWTF eliminating the <br /> need to cross the 4 Street canal on the 82" Avenue bridge. This alternative however, <br /> requires more force main to be constructed than was originally bid <br /> Funds for the project have been approved by the BCC from the Utilities Department <br /> Capital Projects Fund Account No 472- 169000-06512 on 05/ 16/06 <br /> Attachment 1 <br /> Chzngc Grdcr Fmm <br /> 00450 - - 1 - <br /> FWliliti¢VITILITY - ENGMEERING\Projects - UliGty Consvualon Prrmhs%IRC - 74th Av - eIh SIFMReIid Press SRW - UCP92598SCHULKE\A - 00050 - Change Ordrr ko Idoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.