Laserfiche WebLink
NOTICE OF INTENT TO USE THE GENERAL PERMIT FOR CONSTRUCTION OF WATER MAIN <br />EXTENSIONS FOR PWSs <br />j Protect Name: Oslo Road/Lateral 'J' Bridge Replacement Permittee: Indian River County <br />111. Certifications <br />A. Certification by Permittee <br />I am duly authorized to sign this notice on behalf of the permittee identified in Part LF of this notice. I certify that, to the best of <br />my knowledge and belief, this project complies with Chapter 62-555, F.A.C. I also certify that construction of this project has not <br />begun yet and that, to the best of my knowledge and belief, this project does not include any of the following construction work: <br />• construction of water mains conveying raw or partially treated drinking water; <br />• construction of drinking water treatment, pumping, or storage facilities or conflict manholes; <br />• construction of water mains in areas contaminated by low -molecular -weight petroleum products or organic solvents; <br />• construction of an interconnection between previously separate public water systems or construction of water mains that create <br />a "new system" as described under subsection 62-555.525(1), F.A.C.; or <br />• construction of water mains that will remain dry following completion of construction. <br />(A specific construction permit is required for each project involving any of the above listed construction work.) <br />I understand that, if this project is designed under the responsible charge of one or more professional engineers (PEs) licensed in <br />Florida, the permittee must retain a Florida -licensed PE to take responsible charge of inspecting construction of this project for the <br />purpose of determining in general if the construction proceeds in compliance with the Department of Environmental Protection <br />construction permit, including the approved preliminary design report, for this project. I understand that the permittee must have <br />complete record drawings prepared for this project. I also understand that the permittee must submit a certification of construction <br />completion to the Department and obtain written approval, or clearance, from the Department before the permittee places this <br />project into operation for any purpose other than disinfection or testing for leaks. <br />Signature and Date <br />B. Certification by PWS Supplying Water to Project <br />Gordon Sparks <br />Printed or Typed Name <br />Environmental Engineer <br />Title <br />I am duly authorized to sign this notice on behalf of the PWS identified in Part I.G of this notice. I certify that said PWS will <br />supply the water necessary to meet the design water demands for this project. As indicated below, the water treatment plant(s) to <br />which this project will be connected has(have) the capacity necessary to meet the design water demands for this project, and I <br />certify that all other PWS components affected by this project also have the capacity necessary to meet the design water demands <br />for this project. I certify that said PWS is in compliance with applicable planning requirements in Rule 62-555.348, F.A.C.; <br />applicable cross -connection control requirements in Rule 62-555.360, F.A.C.; and to the best of my knowledge and belief, all other <br />applicable rules in Chapters 62-550, 62-555, and 62-699, F.A.C.; furthermore, I certify that, to the best of my knowledge and <br />belief, said PWS's connection to this project will not cause said PWS to be in noncompliance with Chapter 62-550 or 62-555, <br />F.A.C. I also certify that said PWS has reviewed the preliminary design report for this project and that said PWS considers the <br />connection(s) between this project and said PWS acceptable as designed. <br />• Name(s) of Water Treatment Plant(s) to Which this Project Will Be Connected: North County & South County RO Water <br />• Total Permitted Maximum Day Operating Capacity of Plant(s), gpd: 12.1 MGD <br />• Total Maximum Day Flow at Plant(s) as Recorded on Monthly Operating Reports During Past 12 Months, gpd <br />Signature and Date <br />Gordon Sparks <br />Printed or Typed Name <br />C. Certification by PWS that Will Own Project After It Is Placed into Permanent Operation <br />9.78 MGD <br />Environmental Engineer <br />Title <br />I am duly authorized to sign this notice on behalf of the PWS identified in Part LH of this notice. I certify that said PWS will own <br />this project after it is placed into permanent operation. I also certify that said PWS has reviewed the preliminary design report for <br />this project and that said PWS considers this project acceptable as designed. <br />Signature and Date <br />Gordon Sparks <br />Printed or Typed Name <br />DEP Form 62-555.900(7) Page 7 <br />Effective August 28, 2003 <br />Environmental Engineer <br />Title <br />