NOTICE OF INTENT TO USE THE GENERAL PERMIT FOR CONSTRUCTION OF WATER MAIN <br />EXTENSIONS FOR PWSs <br />Project Name: Oslo Road/Lateral 'J' Bridge Replacement I Permittee: Indian River Countv <br />w. New or relocated, underground water mains included in this project will be laid to provide a horizontal distance <br />of at least three feet between the outside of the water main and the outside of any existing or proposed vacuum - <br />type sanitary sewer, storm sewer, stormwater force main, or pipeline conveying reclaimed water regulated <br />under Part III of Chapter 62-610, F.A.C.; a horizontal distance of at least six feet between the outside of the <br />water main and the outside of any existing or proposed gravity -type sanitary sewer (or a horizontal distance of <br />at least three feet between the outside of the water main and the outside of any existing or proposed gravity - <br />type sanitary sewer if the bottom of the water main will be laid at least six inches above the top of the sewer); a <br />horizontal distance of at least six feet between the outside of the water main and the outside of any existing or <br />proposed pressure-type sanitary sewer, wastewater force main, or pipeline conveying reclaimed water not <br />regulated under Part III of Chapter 62-610, F.A.C.; and a horizontal distance of at least ten feet between the <br />outside of the water main and all parts of any existing or proposed "on-site sewage treatment and disposal <br />system." [FAC 62-555.314(1); exceptions allowed under FAC 62-555.314(5)] <br />x. New or relocated, underground water mains that are included in this project and that will cross any existing or <br />proposed gravity- or vacuum -type sanitary sewer or storm sewer will be laid so the outside of the water main is <br />at least six inches above the other pipeline or at least 12 inches below the other pipeline; and new or relocated, <br />underground water mains that are included in this project and that will cross any existing or proposed pressure- <br />type sanitary sewer, wastewater or stormwater force main, or pipeline conveying reclaimed water will be laid <br />so the outside of the water main is at least 12 inches above or below the other pipeline. [FAC 62-555.314(2); <br />exceptions allowed under FAC 62-555.314(5)] <br />y. At the utility crossings described in Part II.C. Lw above, one full length of water main pipe will be centered <br />above or below the other pipeline so the water main joints will be as far as possible from the other pipeline or <br />the pipes will be arranged so that all water main joints are at least three feet from all joints in vacuum -type <br />sanitary sewers, storm sewers, stormwater force mains, or pipelines conveying reclaimed water regulated under <br />Part III of Chapter 62-610, F.A.C., and at least six feet from all joints in gravity- or pressure-type sanitary <br />sewers, wastewater force mains, or pipelines conveying reclaimed water not regulated under Part III of Chapter <br />62-610, F.A.C. [FAC 62-555.314(2); exceptions allowed under FAC 62-555.314(5)] <br />N/A z. New or altered water mains that are included in this project and that will cross above surface water will be <br />adequately supported and anchored, protected from damage and freezing, and accessible for repair or <br />replacement. [FAC 62-555.320(21)(b) and RSWW 8.7.1] <br />aa. New or altered water mains that are included in this project and that will cross under surface water will have a <br />minimum cover of two feet. [FAC 62-555.320(21)(b) and RSWW 8.7.2] <br />bb. New or altered water mains that are included in this project and that will cross under surface water courses <br />greater than 15 feet in width will have flexible or restrained, watertight pipe joints and will include valves at <br />both ends of the water crossing so the underwater main can be isolated for testing and repair; the <br />aforementioned isolation valves will be easily accessible and will not be subject to flooding; the isolation valve <br />closest to the water supply source will be in a manhole; and permanent taps will be provided on each side of the <br />isolation valve within the manhole to allow for insertion of a small meter to determine leakage from the <br />underwater main and to allow for sampling of water from the underwater main. [FAC 62-555.320(21)(b) and RSWW <br />&7.2] <br />N/A _ cc. This project is being designed to include proper backflow protection at those new or altered service <br />connections where backflow protection is required or recommended under Rule 62-555.360, F.A.C., or in <br />Recommended Practice for Backflow Prevention and Cross -Connection Control, AWWA Manual M14, as <br />incorporated into Rule 62-555.330, F.A.C.; or the public water system that will own this project after it is <br />placed into operation has a cross -connection control program requiring water customers to install proper <br />backflow protection at those service connections where backflow protection is required or recommended under <br />Rule 62-555.360, F.A.C., or in AWWA Manual M14. [FAC 62-555.360 and AWWA Manual M14 as incorporated into <br />FAC 62-555.3301 <br />N/A _ dd. Neither steam condensate, cooling water from engine jackets, nor water used in conjunction with heat <br />exchangers will be returned to the new or altered water mains included in this project. [FAC 62-555.320(21)(b) and <br />RSWW 8.8.21 <br />DEP Form 62-555.900(7) Page 5 <br />Effective August 28, 2003 <br />