My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-420
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-420
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 1:53:45 PM
Creation date
9/30/2015 11:30:52 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
12/04/2007
Control Number
2007-420
Agenda Item Number
11.J.2
Entity Name
SPS Contracting, Inc.
Subject
Force Main replacement CR 510 to A1A from Wabasso Bridge
Change Order No.1
Area
Wabasso and A1-A
Project Number
0649
Supplemental fields
SmeadsoftID
6717
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' r <br /> ATTACHMENT 2 <br /> IRCUD 12" Force Main <br /> CR 510 <br /> Wabasso Bridge to A1A <br /> Change Order # 1 <br /> Cost Exhibit <br /> Item Description Quantity Unit I Unit Price Total <br /> 1 14 " HDPE Pie 400 LF $ 31 . 30 $ 12 , 520 . 00 <br /> 2 12" Gate Valve 3 EA $ 3 , 200 . 00 $ 9 , 600 . 00 <br /> 3 12" x 6" Cross 1 EA $ 1 , 575 . 00 $ 1 , 575 . 00 <br /> 4 12" Tee 1 EA $ 1 , 575 . 00 $ 1 , 575 . 00 <br /> 5 12" MJ Ta Ca 1 EA $ 310 . 00 $ 310 . 00 <br /> 6 10" Gate Valve 1 EA 21800 . 00 <br /> 7 6" C900 PVC 40 LF $ 19 . 50 $ 780 . 00 - <br /> 8 6" Gate Valve 2 EA $ 11654. 00 $ 3308 . 00 - <br /> 9 Rehab WetWell w/ B Pass Pum 1 LS $ 261301 . 00 $ 267301 . 00 <br /> 10 Lift Station Dewatenn 1 LS $ 11500 . 00 $ 1 , 500 . 00 <br /> 11 12" Wet Ta w/Gate Valve 2 EA $ 5 , 600 . 00 $ 11 , 200. 00 <br /> Change Order #1 Total Cost $ 49 , 069 . 00 <br /> Hand digging of a trench is from exiting grade to bottom of the trench . <br /> Partial hand digging of a trench is not considered a hand dug trench . <br /> The rate for hand digging is $32. 50 per linear foot and will be an addition to the contract if encountered . <br /> fa 0'7 <br /> Earl H . Masteller E. , DEE Date <br /> President <br /> Masteller & Moler, Inc. <br /> Prepared by Masteller & Moler, Inc. <br /> /Ikb <br /> Rev 5 Revised <br /> File #0649 <br /> Cost Exh_Chg Ord #1110807 Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.